Or. Admin. R. 632-015-0050 - Filing of Reports
Current through Register Vol. 61, No. 4, April 1, 2022
(1)
Report on Completion. Within 45 days after the completion of the plugging of an
information hole or seismic shot hole, the owner or operator must file a report
with the department setting forth in detail the method used in plugging the
well or wells. The report must be in a form acceptable to the
department.
(2) The drilling
records:
(a) Must be in narrative form and
include a map showing the location and depth of each shot hole or information
hole so that it can be located; and
(b) Must indicate all work that has been
performed in compliance with the permit issued for the seismic program or
information hole operation.
(3) Within 60 days after plugging, the
permittee must file an affidavit with the department, setting forth the
location of the information hole or seismic program and the method used to
protect such water-bearing formation, if any, that was penetrated during the
program or operation.
Notes
Stat. Auth.: ORS 516.090 & 520.095
Stats. Implemented: 520.027, 520.095 & 520.097