Or. Admin. R. 635-042-0001 - Management and Catch Reporting Areas
Management and Catch Reporting Zones shall include those waters of the Columbia River defined as follows:
(1) Zone 1 is easterly of a line projected
from the knuckle of the south jetty on the Oregon bank to the inshore end of
the north jetty on the Washington bank, and westerly of a line projected from a
beacon light at Grays Point on the Washington bank to the flashing 4-second red
buoy "44" off the easterly tip of Tongue Point on the Oregon bank.
(2) Zone 2 is easterly of a line projected
from a beacon light at Grays Point on the Washington bank to the flashing
4-second red buoy "44" off the easterly tip of Tongue Point on the Oregon bank,
and westerly of a line projected from the 4-second flashing green light "81" on
the Washington bank to a boundary marker on the easterly end of the Beaver
Terminal Pier in Oregon, including all waters of Grays Bay, those waters of
Deep River downstream of the Highway 4 Bridge, all waters of Seal Slough, those
waters of Grays River downstream of a line projected between fishing boundary
markers on both banks at the Leo Reisticka farm, and those waters of Elokomin
Slough and Elokomin River downstream of the Highway 4 Bridge.
(3) Zone 3 is easterly of a line projected
from the 4-second flashing green light "81" on the Washington bank to a
boundary marker on the easterly end of the Beaver Terminal Pier in Oregon, and
westerly of a line projected true west from the east or upstream bank of the
Lewis River mouth in Washington.
(4) Zone 4 is easterly of a line projected
true west from the east or upstream bank of the Lewis River in Washington, and
westerly of a line projected true north from Rooster Rock on the Oregon bank,
and those waters of Camas Slough downstream of the western most powerline
crossing at the James River Mill.
(5) Zone 5 is easterly of a line projected
true north from Rooster Rock on the Oregon bank, and westerly of a line
projected from a deadline marker on the Oregon bank (approximately four miles
downstream from Bonneville Dam Powerhouse 1) in a straight line through the
western tip of Pierce Island, to a deadline marker on the Washington bank at
Beacon Rock.
(6) Area 2S is from a
downstream boundary of a true north/south line through flashing red 4-second
light "50" near the Oregon bank to an upstream boundary of a straight line from
a deadline marker on the Oregon bank (approximately four miles downstream from
Bonneville Dam Powerhouse 1) through the western tip of Pierce Island, to a
deadline marker on the Washington bank at Beacon Rock.
Notes
Stat. Auth.: ORS 183.325, 496.118 & 506.119
Stats. Implemented: ORS 506.129 & 507.030
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.