Or. Admin. R. 660-011-0005 - Definitions
(1) "Public
Facilities Plan": A public facility plan is a support document or documents to
a comprehensive plan. The facility plan describes the water, sewer and
transportation facilities which are to support the land uses designated in the
appropriate acknowledged comprehensive plans within an urban growth boundary
containing a population greater than 2,500. Certain elements of the public
facility plan also shall be adopted as part of the comprehensive plan, as
specified in OAR 660-11-045.
(2)
"Rough Cost Estimates": Rough cost estimates are approximate costs expressed in
current-year (year closest to the period of public facility plan development)
dollars. It is not intended that project cost estimates be as exact as is
required for budgeting purposes.
(3) "Short Term": The short term is the
period from year one through year five of the facility plan.
(4) "Long Term": The long term is the period
from year six through the remainder of the planning period.
(5) "Public Facility": A public facility
includes water, sewer, and transportation facilities, but does not include
buildings, structures or equipment incidental to the direct operation of those
facilities.
(6) "Public Facility
Project": A public facility project is the construction or reconstruction of a
water, sewer, or transportation facility within a public facility system that
is funded or utilized by members of the general public.
(7) "Public Facility Systems": Public
facility systems are those facilities of a particular type that combine to
provide water, sewer or transportation services.
For purposes of this division, public facility systems are limited to the following:
(a) Water:
(A) Sources of water;
(B) Treatment system;
(C) Storage system;
(D) Pumping system;
(E) Primary distribution system.
(b) Sanitary sewer:
(A) Treatment facilities system;
(B) Primary collection system.
(c) Storm sewer:
(A) Major drainageways (major trunk lines,
streams, ditches, pump stations and retention basins);
(B) Outfall locations.
(d) Transportation:
(A) Freeway system, if planned for in the
acknowledged comprehensive plan;
(B) Arterial system;
(C) Significant collector system;
(D) Bridge system (those on the Federal
Bridge Inventory);
(E) Mass transit
facilities if planned for in the acknowledged comprehensive plan, including
purchase of new buses if total fleet is less than 200 buses, rail lines or
transit stations associated with providing transit service to major
transportation corridors and park and ride station;
(F) Airport facilities as identified in the
current airport master plans;
(G)
Bicycle paths if planned for in the acknowledged comprehensive plan.
(8) "Land Use
Decisions": In accordance with ORS
197.712(2)(e),
project timing and financing provisions of public facility plans shall not be
considered land use decisions as specified under ORS
197.015(10).
(9) "Urban Growth Management Agreement": In
accordance with OAR 660-003-0010(2)(c), and urban growth management agreement
is a written statement, agreement or set of agreements setting forth the means
by which a plan for management of the unincorporated area within the urban
growth boundary will be completed and by which the urban growth boundary may be
modified (unless the same information is incorporated in other acknowledged
documents).
(10) Other Definitions:
For the purposes of this division, the definitions in ORS
197.015 shall apply except as
provided for in section (8) of this rule regarding the definition in ORS
197.015(10).
Notes
Stat. Auth.: ORS 183 & ORS 197
Stats. Implemented: ORS 197.712
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.