Or. Admin. R. 690-230-0070 - Well-Head Protection Equipment

Adequate well-head equipment to insure public safety and the protection of the groundwater resource shall be immediately installed on any low-temperature geothermal production well or low-temperature geothermal injection well when the temperature of the fluid being withdrawn from, being pumped from, or flowing from the well bore exceeds 65 degrees C (150 degrees F). A variance from the requirement for well-head protection equipment may be granted if a written request demonstrates that the equipment is not necessary to safely complete the well.

Notes

Or. Admin. R. 690-230-0070
WRD 12-1982, f. & ef. 12-14-82; WRD 13-1986, f. 10-7-86, ef. 11-1-86, Renumbered from 690-065-0035; WRD 18-1990, f. & cert. ef. 12-14-90

Stat. Auth.: ORS 183, ORS 536, ORS 537 & ORS 540

Stats. Implemented: ORS 183, ORS 536, ORS 537 & ORS 540

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.