Or. Admin. R. 736-009-0030 - Establishing Oregon Scenic Bikeways
Pursuant to ORS 390.962(1), the department prescribes the criteria in this rule in addition to those provided in the Oregon Recreation Trails System Act, ORS 390.950 to 390.989 and 390.995(2), for the designation of Oregon Scenic Bikeways.
(1) Oregon Scenic Bikeways may be comprised
of bicycle paths, designated transportation corridors or a combination thereof.
Oregon Scenic Bikeways may include route sections located in or near existing
rights-of-way for roads or highways.
(2) Oregon Scenic Bikeways may be linear,
loop, or a combination of linear and loop routes that are routes of superior
scenic quality that inspire people to experience Oregon's natural beauty and
cultural heritage by bicycle.
(3)
Pursuant to ORS 390.962(1), an
Oregon Scenic Bikeway may be located:
(a)
Over public land with the consent of each governmental entity having
jurisdiction over the lands designated; or
(b) Over privately-owned lands in the manner
and subject to the limitations provided in ORS
390.950 to
390.989 and
390.995(2).
(4) The Department will
periodically call for Bikeway applications.
(5) Evaluation of Applications
(a) To be considered as an Oregon Scenic
Bikeway, a proponent must submit to the department a completed Oregon Scenic
Bikeway Application form in the format specified by the department.
(b) The department will review each Oregon
Scenic Bikeway proposal for completeness, including whether the application
adequately addressees the considerations provided in ORS
390.965(2). The
department will provide all complete, eligible applications to the committee.
Incomplete or ineligible applications will be returned to the proponents with
an explanation of the deficiencies.
(c) The committee will consider routes for
designation based on the criteria provided in sections (1)-(3) of this rule and
the Oregon Recreation Trails System Act, ORS
390.950 to
390.989 and
390.995(2).
(d) The committee shall conduct a
field review of the proposed route, to include a review conducted on bicycles
by no less than three (3) members of the committee.
(e) The committee shall score the route
against criteria established in the Oregon Recreation Trails System Act, ORS
390.950 through
390.989 and
390.995, and this rule,
including but not limited to:
(A) Emphasis on
use of public lands,
(B)
Minimizing adverse effects on adjacent landowners,
(C) Harmony with and complement to
established forest, agricultural, or other use plans, and
(D) Any natural features, agriculture,
forest, unusual or unique landforms, vegetation, water components, scenic
beauty and interest, as well as amenities available to the route.
(f) Based on the application,
field review and scoring the committee shall determine if the route qualifies
to be recommended for designation as an Oregon Scenic Bikeway.
(g) The committee will forward
recommendations for designation to ORTAC for consultation during an ORTAC
public meeting.
(h) The committee
will forward recommendations for designation to the director for approval to
advance to the designation process.
(i) If the committee does not recommend
designating the route as an Oregon Scenic Bikeway, it shall provide comments
and recommendations to the proponent. The proponent may reapply to the
department only after fully addressing the recommendations of the committee.
(6) Designation
Process:
(a) The Proponent must submit to the
department a completed Bikeway Plan in the format specified by the department.
(b) The department shall hold
public meetings on the recommended designation as provided in ORS
390.965(1).
(c) The committee shall provide
each recommendation for designation as an Oregon Scenic Bikeway to the
director.
(d) After the public
meetings required in subsection (b) the director shall either:
(A) Submit the committee's recommendation to
the commission for approval or denial of the proposed Oregon Scenic Bikeway; or
(B) Request that the committee
provide further consideration of issues presented in the public meeting.
(7) Scenic
Bikeway Management
(a) The department will
enter into written cooperative agreements with landowners, federal agencies,
other state agencies, local governments, private organizations and individuals
as necessary to ensure that the development, signing, operation, maintenance,
location or relocation of the trail meet the Oregon Scenic Bikeway Standards.
(b) The department shall evaluate
each Oregon Scenic Bikeway at least once every five (5) years. The department
will provide the committee an evaluation of the Scenic Bikeway including any
significant changes on the route that would diminish its scenic qualities and
the strength of the local proponent group. Upon review, the committee may
recommend:
(A) The trail be improved to meet
the standards of state designation; or
(B) Removal of Oregon Scenic Bikeway
designation when or if the route no longer meets the criteria.
(c) Signing and Publication of
Oregon Scenic Bikeway.
(A) Consistent with
the requirements of ORS
390.959, the department will
establish sign standards and coordinate sign placement for all routes that the
commission designates as an Oregon Scenic Bikeway.
(B) The department will publish on its web
page and make available standardized route maps for all Oregon Scenic
Bikeways.
Notes
Stat. Auth.: ORS 390.971(8)
Stats. Implemented: ORS 390.956, 390.959, 390.962, 390.968 & 390.971
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.