Or. Admin. R. 860-084-0210 - Capacity Reservation, Timing, and Duration
(1) A capacity reservation expires if a
completed interconnection application is not filed within two months of the
reservation start date or if the system has not been installed within twelve
months of the reservation start date, unless a waiver is granted under OAR
860-084-0000. Any delay resulting from the utility not completing required work
to connect the eligible system to the grid will be excluded from this 12-month
installation requirement.
(2) Once
the capacity reservation expires, the retail electricity consumer must newly
apply for a capacity reservation and will not be given preferential
treatment.