Or. Admin. R. 860-084-0400 - Data Collection
Except as provided in OAR 860-084-0440, each electric company must collect from the retail electricity consumer participating in the pilot program data on the installed solar photovoltaic system. The collected data elements must include, but are not limited to:
(1) Nameplate Capacity;
(2) Total Installed Cost;
(3) Photovoltaic module cost;
(4) Non-photovoltaic module cost (including
inverters, other hardware, labor, overhead, and regulatory compliance
costs);
(5) Total financing
cost;
(6) Financing terms
(including fees paid, loan term, and interest rate secured);
(7) System location, including street address
and GPS location;
(8) Technology
type (building-integrated versus rack-mounted, crystalline silicon versus
thin-film, solar tracking versus rack-mounted, etc.);
(9) Federal tax credit;
(10) In-service date;
(11) Expected annual energy output;
(12) Date of certification of compliance;
and
(13) Class of service of retail
electricity consumer.
(14) Electric
companies must collect data on the time to interconnection agreement and
conduct pilot program satisfaction surveys in order to improve capacity
reservation and interconnection processes over the pilot program. Data
collection and surveys must include:
(a)
Interconnection agreements that have not been negotiated between the
electricity company and the retail electricity consumer within six months after
an application for interconnection has been filed; or
(b) Retail electricity consumers that have
reserved capacity under the pilot programs and whose capacity reservations
expire before solar photovoltaic energy systems are
installed.
Notes
Stat Auth: ORS 757.360 - 757.380
Stats. Implemented: ORS 757.360 - 757.380