Or. Admin. R. 918-305-0420 - Electrified Fixed Guideway Passenger Railway System Permits
(1) The signature of a
general supervising electrician or limited supervising electrician shall be
required on each permit to aid inspections by the division and indicate
responsibility under ORS
479.950.
(2) A permit is required prior to start of
any electrical work. Expansion of work under a permit may be added to an
existing permit prior to final inspection.
(3) A permit must be posted in a conspicuous
place near the main electrical panel location. If there is no main panel
installed, the permit shall be posted in a conspicuous place on the job
site.
(4) An electrical permit
issued to one person or firm is not transferable and shall not permit any other
person or firm to perform any electrical work thereunder.
(5) Any permittee holding an unexpired permit
may apply for an extension of the time within which work may be
completed.
(6) Permit fees shall be
charged at $69 per hour including travel and office time with a minimum charge
of one hour for any and all inspections performed on that permit.