Or. Admin. R. 918-050-0130 - Statewide Fee Methodologies for Manufactured Home Siting Permits
(1) A municipality
shall charge a single fee for the installation and setup of manufactured homes.
This fee shall include the concrete slab, runners or foundations when they
comply with the prescriptive requirements of the Oregon Manufactured
Dwelling and Park Specialty Code, electrical feeder and plumbing
connections and all cross-over connections.
(2) Decks, other accessory structures and
foundations that do not comply with the prescriptive requirements of the
Oregon Manufactured Dwelling and Park Specialty Code, utility
connections beyond 30 lineal feet, new electrical services or additional branch
circuits, new plumbing, and other such items that fall under the building code
may require separate permits.
(3)
When a municipality has reason to believe that the existing electrical service
to a manufactured dwelling may be unsafe or inadequate, the municipality may
require a separate permit to inspect the electrical service.
Notes
Publications: Publications referenced are available from the agency.
Stat. Auth.: ORS 455.048 & 455.055
Stats. Implemented: ORS 455.046 & 455.055
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.