Or. Admin. Code § 141-089-0715 - Temporary Impacts to Non-Tidal Wetlands - Activity-Specific Conditions
Projects eligible for this GA must adhere to the general conditions in OAR 141-089-0650 and the following activity-specific conditions:
(1) Temporary Impact
Rectification. Rectification of temporary impacts includes re-establishment of
pre-existing contours and pre-existing vegetation.
(2) Timing of Temporary Impact Rectification.
Re-establishment of pre-construction contours and planting to re-vegetate
temporarily disturbed areas must be completed within 24 months of the initial
impacts. However, if the temporary impact requires only one construction
season, site rectification must be completed within the same construction
season as the temporary impact. Planting must include species of sufficient
number, spacing, and diversity to replace affected aquatic functions.
(3) Post-Construction Report Required. Within
two years of planting, a report must be submitted to the Department. The report
must include:
(a) Data plots, according to OAR
141-090, to confirm that the wetland area impacted by the project meets wetland
criteria; and
(b) Photos taken at
the previously established photo points.
(4) Protection of Ground Surface. Before
placing temporary fill in wetlands, fabric must be placed to allow complete
removal of all temporary materials from the wetlands. If necessary to assist
with removal of the fill, chain link fence or similar material may be placed
under the fill. All fabric, fencing and other materials must be completely
removed at project completion.
(5)
Stockpile Topsoil. When trenching, the upper 12 inches of topsoil must be
removed and stockpiled separately from subsurface soils and used as the final
layer in backfilling.
(6) Prevent
Hydraulic Piping. The project must be constructed to prevent underground
hydraulic piping to dewater the site or adjacent wetlands. If the native
underlying soils are not used as bedding material, and a coarser, non-native
soil or other material is used, preventive measures must be used such as
restoration of the restrictive layer and placement of clay or other impermeable
plugs. Such plugs must be placed at each wetland boundary.
Notes
Statutory/Other Authority: ORS 196.600 - 196.692 & 196.795 - 196.990
Statutes/Other Implemented: ORS 196.600 - 196.692 & 196.795 - 196.990