Or. Admin. Code § 632-020-0105 - Directional Drilling
(1)
The maximum point at which a well penetrates the producing formation must not
vary from the vertical drawn from the center of the hole at the surface by more
than 5 degrees. Deviation is permitted without special permission for short
distances to straighten the hole, sidetrack junk, or to correct other
mechanical difficulties.
(2) Except
for the purposes of straightening the hole, sidetracking junk, or correcting
mechanical difficulties as provided in this rule, an operator may not drill a
well that deviates from vertical unless the operator first files an application
and obtains a permit from the department. If drilling is in progress, the
operator must notify the department immediately of the deviation of the hole
and file a written request with the department for approval, as required. If
the department does not approve, the permittee must set a cement plug at the
point of deviation from vertical and complete the well as originally approved
or plug the well.
Notes
Stat. Auth.: ORS 522
Stats. Implemented: ORS 522.305