Or. Admin. Code § 632-037-0070 - Reclamation and Closure Plan
The Reclamation and Closure Plan section of a consolidated application shall include but not be limited to the following provisions for the protection of public health, safety, and the environment:
(1) Procedures for the salvage, storage and
replacement of topsoil or acceptable substitute.
(2) Provisions for recontouring,
stabilization and topsoil replacement of all disturbed areas, where
appropriate.
(3) Provisions for the
revegetation of all disturbed areas consistent with the establishment of a
self-sustaining ecosystem, comparable to undamaged ecosystems in the area of
the mine. This shall include but not be limited to seedbed preparation,
mulching, fertilizing, species selection, seeding planting rates and schedules.
If applicable, the applicant shall include a plan for control of noxious weeds
as identified by the Department of Agriculture.
(4) Characterization and management plan for
all wastes, including quantity and quality.
(5) Provisions for specifying adequate
setbacks from adjacent property boundaries and from surface waters or other
resources when necessary to ensure compliance with environmental
standards.
(6) Procedures for all
impacted or reconstructed stream channels, riparian area vegetation and stream
banks to be rehabilitated or restored so as to maximize water retention and to
minimize bank erosion, channel scour, siltation, and increased water
temperatures.
(7) Provisions for
prevention of stagnant water may be required by the Department.
(8) Provisions for the establishment of
required slopes, including reclaimed highwalls and in-water slopes.
(9) Provisions for visual screening of
proposed operation if the permit area is visible from a public highway or
residential area. Techniques for visual screening include but are not limited
to vegetation, fencing or berms.
(10) Procedures for the removal or disposal
of all equipment, refuse, structures and foundations from the permit
area.
(11) Provisions to maintain
access to utilities when a utility company right-of-way exists.
(12) Procedures or information for
decommissioning mine facilities including but not limited to:
(a) Procedures for ore storage sites to meet
decommissioning performance standards for protection of air quality, surface
and ground water quantity and quality and living resources and to achieve
reclamation requirements;
(b)
Procedures for tailing disposal facility to meet decommissioning performance
standards for long-term stability, protection of air quality, surface and
ground water quantity and quality and living resources and to provide for
attainment of reclamation objectives;
(c) Removal of all process
chemicals;
(d) Appropriate
isolation or removal of waste material; and
(e) Monitoring systems by which the success
of the proposed reclamation and closure can be measured for bond
release.
(13) An estimate
of the total cost of reclamation consistent with the standards imposed under
ORS 517.750 to
517.955.
Notes
Stat. Auth.: ORS 517.750 - ORS 517.995
Stats. Implemented: ORS 517.971
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.