Or. Admin. Code § 740-105-0210 - Methods of Preheating

(1) Preheating may be accomplished by flame or electrical resistance method.
(2)
(a) Preheat parameters.
(b) All preheating performed under the conditions of this procedure must comply with the following preheat parameters.
(A) In cases where no preheat is specified, and the ambient temperature is below 32 degrees F, the base metal must be preheated to at least 70 degrees F prior to welding and/or tack welding.
(B) Preheating will be done at least three (3) inches laterally and in advance of the welding.
(C) Welding will not be performed on surfaces that are wet or under high wind conditions without proper weather protection.

Notes

Or. Admin. Code § 740-105-0210
PUC 16-1993, f. & cert. ef. 8-19-93 (Order No. 93-1157); MCT 3-1996, f. & cert. ef. 3-14-96; Renumbered from 860-066-0111

Stat. Auth.: ORS 183.335, ORS 823.011, ORS 825.210 & ORS 825.252

Stats. Implemented: ORS 825.210 & ORS 825.252

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.