25 Pa. Code § 293.232 - Soil erosion and sedimentation control

The operator shall manage surface water and control erosion and sedimentation to:

(1) Divert surface water away from the storage area with measures and structures necessary to handle surface water flows based on a 25-year, 24-hour precipitation event, and supported by written calculations and also comply with Chapter 102 (relating to erosion control).
(2) Meet the requirements of Chapters 102 and 105 (relating to erosion and sediment control; and dam safety and waterway management).
(3) Prevent erosion to the maximum extent possible, including where possible, using revegetation.

Notes

25 Pa. Code § 293.232
The provisions of this § 293.232 amended January 12, 2001, effective 1/13/2001, 31 Pa.B. 235.

This section cited in 25 Pa. Code § 293.105 (relating to soil plan).

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.