25 Pa. Code § 89.11 - General requirements

As required by Chapter 102 (relating to erosion and sediment control), the operator shall prepare and submit, as part of the application, an erosion and sedimentation control plan for all areas disturbed by earthmoving activities. The erosion and sedimentation control plan shall include, at a minimum, the information required by this subchapter, and shall be designed and implemented to achieve the performance standards set forth in this subchapter.

Notes

25 Pa. Code § 89.11
The provisions of this § 89.11 adopted December 19, 1980, 10 Pa.B. 4789, effective 7/31/1982, 12 Pa.B. 2382; amended July 30, 1982, 12 Pa.B. 2473, effective 7/31/1982, 12 Pa.B. 2382.

This section cited in 25 Pa. Code § 88.493 (relating to minimum environmental protection performance standards).

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.