25 Pa. Code § 89.172 - Informational requirements
(a) An
application for a coal preparation activity shall contain:
(1) An erosion and sedimentation control plan
under Subchapter A (relating to erosion and sedimentation control).
(2) An operation plan which specifies plans
for the construction, operation and maintenance of the preparation
plant.
(3) A reclamation plan which
specifies plans for the removal of the preparation activities and reclamation
of the affected area.
(4) The
information requirements of Subchapter E (relating to prime farmlands), if
applicable.
(b) An
application shall demonstrate that the coal preparation activities will be
conducted in compliance with the performance standards of this subchapter. A
permit will not be issued unless the Department finds, in writing, that the
activity will be conducted in compliance with the performance standards of
§
89.173 (relating to performance
standards).
Notes
The provisions of this § 89.172 amended under the Surface Mining Conservation and Reclamation Act (52 P.S. §§ 1396.1-1396.19a); The Bituminous Mine Subsidence and Land Conservation Act (52 P.S. §§ 1406.1-1406.21); The Clean Streams Law (35 P.S. §§ 691.1-691.1001); and section 1920-A of The Administrative Code of 1929 (71 P.S. § 510-20).
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.