Pa. Code tit. 25, pt. I, subpt. C, art. I, ch. 89 - UNDERGROUND MINING OF COAL AND COAL PREPARATION FACILITIES

  1. Subchapter A - EROSION AND SEDIMENTATION CONTROL, version 7
  2. Subchapter B - OPERATIONS, version 8
  3. Subchapter C - RECLAMATION
  4. Subchapter D - STRUCTURAL REQUIREMENTS FOR IMPOUNDMENTS, version 11
  5. Subchapter E - PRIME FARMLANDS, version 7
  6. Subchapter F - SUBSIDENCE CONTROL AND WATER SUPPLY REPLACEMENT (§ 89.141 to 89.155)
  7. Subchapter G - IN SITU PROCESSING (§ 89.161 to 89.163)
  8. Subchapter H - COAL PREPARATION ACTIVITIES (§ 89.171 to 89.173)

Notes

Pa. Code tit. 25, pt. I, subpt. C, art. I, ch. 89

The provisions of this Chapter 89 issued and amended under The Clean Streams Law (35 P.S. §§ 691.1-691.1001); the Surface Mining Conservation and Reclamation Act (52 P.S. §§ 1396.1-1396.31); The Bituminous Mine Subsidence and Land Conservation Act (52 P.S. §§ 1406.1-1406.21); the Coal Refuse Disposal Control Act (52 P.S. §§ 30.51-30.66); and Article XIX-A of The Administrative Code of 1929 (71 P.S. §§ 510-1-510-108), unless otherwise noted.

This chapter cited in 25 Pa. Code § 77.534 (relating to discharge of water into an underground mine); 25 Pa. Code § 86.1 (relating to definitions); 25 Pa. Code § 86.2 (relating to scope); 25 Pa. Code § 86.12 (relating to continued operation under interim permits); 25 Pa. Code § 86.13 (relating to compliance with permits); 25 Pa. Code § 86.16 (relating to application contents); 25 Pa. Code § 86.38 (relating to criteria for approval or denial: existing structures); 25 Pa. Code § 86.131 (relating to scope); 25 Pa. Code § 86.174 (relating to standards for release of bonds); 25 Pa. Code § 86.194 (relating to system for assessment of penalties); 25 Pa. Code § 86.201 (relating to procedures for assessment of civil penalties); 25 Pa. Code § 87.120 (relating to hydrologic balance: discharge of water into an underground mine); 25 Pa. Code § 87.131 (relating to disposal of excess spoil); 25 Pa. Code § 87.157 (relating to cessation of operations: temporary); 25 Pa. Code § 88.131 (relating to cessation of operations: temporary); 25 Pa. Code § 88.219 (relating to cessation of operations: temporary); 25 Pa. Code § 88.332 (relating to cessation of operations: temporary); 25 Pa. Code § 88.333 (relating to cessation of operations: permanent); 25 Pa. Code § 90.3 (relating to general requirements: permit); 25 Pa. Code § 90.91 (relating to requirements); 25 Pa. Code § 90.93 (relating to casing and sealing of drilled holes and underground workings); 25 Pa. Code § 90.104 (relating to hydrologic balance: diversions); 25 Pa. Code § 90.119 (relating to hydrologic balance: discharge of water into an underground mine); 25 Pa. Code § 90.127 (relating to coal refuse disposal: disposal in underground coal mines); 25 Pa. Code § 90.167 (relating to cessation of operations: temporary); 25 Pa. Code § 90.168 (relating to cessation of operations: permanent); 25 Pa. Code § 92a.11 (relating to other chapters applicable); 25 Pa. Code § 92a.12 (relating to treatment requirements); 25 Pa. Code § 102.8 (relating to PCSM requirements); 25 Pa. Code § 102.14 (relating to riparian buffer requirements); 25 Pa. Code Chapter 105 Appendix J (relating to abandoned mine reclamation; general permit BDWW-GP-10); 25 Pa. Code § 290.101 (relating to general requirements for beneficial use); and 25 Pa. Code § 290.104 (relating to beneficial use at coal mining activity sites).

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.