1. Requirements For All Permanent and
Temporary Monitoring Wells.
a. Due to the
nature and purpose of a monitoring well, the depth and location requirements in
respect to surface water bodies, potential contamination sources, etc., are
variable, and shall be approved on a case-by-case basis by the Department. All
monitoring wells shall have Department approval prior to installation or
abandonment. Prior to the construction of any monitoring well, the following
information shall be completed on a form provided and/or approved by the
Department and shall be submitted to the Department:
(1) Proposed well location(s) on a scaled map
or plat;
(2) Proposed well
construction details;
(3) Intended
purpose of the well(s);
(4) Well
owner's name and mailing address;
(5) Property owner's name and mailing
address, if different from the well owner;
(6) Mailing address and county of location
where monitoring wells are to be installed, if different from the well owner's
or property owner's address;
(7)
Proposed parameters to be analyzed; and,
(8) Proposed drilling date.
If any of the information provided to the Department changes,
the Department shall be notified at least 24 hours prior to well
construction.
b.
All monitoring wells shall be drilled, constructed, maintained, operated,
and/or abandoned to ensure that underground sources of drinking water are not
contaminated.
c. All monitoring
wells shall yield water samples and water levels that are representative of the
zone monitored.
d. The well owner
shall submit all analytical data and water levels obtained from each monitoring
well to the Department within 30 days of receipt of laboratory results unless
another schedule has been_approved by the Department.
e. Any monitoring well which is destroyed,
rendered unusable, or abandoned, shall be reported to the Department, and shall
be properly abandoned, revitalized, or replaced as appropriate or as required
by permit or regulation.
f. A Water
Well Record Form 1903 or other form provided and/or approved by the Department
shall be completed and submitted to the Department within 30 days after well
completion or abandonment. At a minimum, the form shall contain the following
information:
(1) Name and address of
facility/owner;
(2) Surveyed or
global positioning system location, in latitude and longitude or Universal
Transverse Mercator coordinates, of monitoring well(s) on a scaled map or
plat;
(3) Driller and certification
number;
(4) Date drilled;
(5) Driller's or Geologist's log;
(6) Total depth;
(7) Screened interval;
(8) Diameter and construction
details;
(9) Depth to groundwater
with date and time measured;
(10)
Surveyed elevation of measuring point with respect to an established
benchmark.
(11) Monitoring well
approval number issued by the Department.
g. Monitoring wells constructed and reported
to satisfy permitting or other regulatory requirements are not required to
submit duplicate reports under this regulation.
h. Any well that acts as a source of
contamination shall be repaired or permanently abandoned immediately after
receipt of notice from the Department.
2. Additional Requirements for Permanent
Conventionally Installed Monitoring Wells
a.
Grouting.
(1) These monitoring wells shall be
grouted from the top of the bentonite seal to the land surface.
(2) Grout is to be composed of neat cement, a
bentonite cement mixture, or high solids sodium bentonite grout.
(a) Neat cement grout shall be composed of
Class A, Type I Portland Cement mixed with not more than seven (7) gallons of
clean water per bag (one cubic foot or 94 pounds) of cement with a density of
15 to 16 pounds per gallon, or to manufacturer's specifications
(b) Bentonite-cement grout shall be composed
of powdered bentonite (less than 5% by weight) mixed at not more than 8 gallons
of water to the bag, with a density of 14 to 15 pounds per gallon, or to
manufacturer's specifications.
(c)
High solids sodium bentonite grout shall have a minimum of 20% solids and be
mixed per manufacturer's specifications with water and/or other required
additives.
(3) The
diameter of the drilled hole shall be large enough to allow for a minimum of
1.5 inches of annular space on all sides of the casing for forced injection of
grout through a tremie pipe.
(4)
All grouting shall be accomplished using forced injection to emplace the grout.
When emplacing the grouting material, the tremie pipe shall be lowered to the
bottom of the zone to be grouted. The tremie pipe shall be kept full
continuously from start to finish of the grouting procedure, with the discharge
end of the tremie pipe being continuously submerged in the grout until the zone
to be grouted is completely filled.
(5) A cement or aggregate reinforced concrete
pad at the ground surface of appropriate durability and strength, considering
the setting and location of each well, that extends six inches beyond the
borehole diameter and six inches below ground surface is required. The pad
shall be capable of preventing infiltration between the surface casing and the
borehole to the subsurface.
b. Construction and Materials
(1) Casing shall be of sufficient strength to
withstand normal forces encountered during and after well installation and be
composed of material so as to minimally affect water quality
analyses.
(2) Casing shall have a
sufficient diameter to provide access for sampling equipment.
(3) A properly hydrated bentonite seal with a
minimum thickness of twelve inches directly above the filter pack shall be
used, if the well has a filter pack.
(4) The monitoring well intake or screen
design shall minimize formational materials from entering the well. The filter
pack shall be utilized opposite the well screen as appropriate so that
parameter analyses will be minimally affected.
(5) A locking cap or other security devices
to prevent damage and/or vandalism shall be used.
(6) Monitoring wells completed below grade
shall be in a watertight vault with a well cap to prevent infiltration of
surface water into the well.
c. Well Identification.
All monitoring wells shall be properly labeled with an
identification plate immediately upon well completion. The identification plate
shall be constructed of a durable, weatherproof, rustproof, material. The
identification plate shall be permanently secured to the well casing or
enclosure floor around the casing where it is readily visible. The
identification plate shall be permanently marked to show:
(1) Company name and certification number of
the driller who installed the well;
(2) Date well was completed;
(3) Total depth (feet);
(4) Casing depth (feet);
(5) Screened interval;
(6) Designator and/or identification
number.
d. Development.
Development shall be complete when the well produces water
typical of the aquifer being utilized.
e. Abandonment
Abandonment shall be by forced injection of grout or pouring
through a tremie pipe starting at the bottom of the well and proceeding to the
surface in one continuous operation. The well shall be filled with either with
neat cement, bentonite-cement, or 20% high solids sodium bentonite grout, from
the bottom of the well to the land surface.
3. Additional Requirements for Permanent
Direct Push Monitoring Wells
a. Direct Push
Wells cannot be installed below a confining layer unless it can be demonstrated
to the satisfaction of the Department that cross-contamination of the aquifer
systems can be prevented.
b.
Grouting.
(1) These monitoring wells shall be
grouted from the top of the bentonite seal to the land surface.
(2) Grout is to be composed of neat cement, a
bentonite cement mixture, or high solids sodium bentonite grout.
(a) Neat cement grout shall be composed of
Class A, Type I Portland Cement mixed with not more than seven (7) gallons of
clean water per bag (one cubic foot or 94 pounds) of cement with a density of
15 to 16 pounds per gallon, or to manufacturer's specifications
(b) Bentonite-cement grout shall be composed
of powdered bentonite (less than 5% by weight) mixed at not more than 8 gallons
of water to the bag, with a density of 14 to 15 pounds per gallon, or to
manufacturer's specifications.
(c)
High solids sodium bentonite grout shall have a minimum of 20% solids and be
mixed per manufacturer's specifications with water and/or other required
additives.
(3) The
diameter of the annular space shall be large enough to allow for forced
injection of grout through a tremie pipe.
(4) All grouting shall be accomplished using
forced injection to emplace the grout. When emplacing the grouting material,
the tremie pipe shall be lowered to the bottom of the zone to be grouted. The
tremie pipe shall be kept full continuously from start to finish of the
grouting procedure, with the discharge end of the tremie pipe being
continuously submerged in the grout until the zone to be grouted is completely
filled.
(5) A cement or aggregate
reinforced concrete pad at the ground surface of appropriate durability and
strength, considering the setting and location of each well, that extends six
inches beyond the borehole diameter and six inches below ground surface is
required. The pad shall be capable of preventing infiltration between the
surface casing and the borehole to the subsurface.
c. Construction and Materials
(1) Casing shall be of sufficient strength to
withstand normal forces encountered during and after well installation and be
composed of material so as to minimally affect water quality
analyses.
(2) Casing shall have a
sufficient diameter to provide access for sampling equipment.
(3) The monitoring well intake or screen
design shall minimize formational materials from entering the well. The well
screen or intake shall be designed so that parameter analyses will be minimally
affected.
(4) A locking cap or
other security devices to prevent damage and/or vandalism shall be
used.
(5) Monitoring wells
completed below grade shall be in a watertight vault with a well cap to prevent
infiltration of surface water into the well.
d. Well Identification.
All monitoring wells shall be properly labeled with an
identification plate immediately upon well completion. The identification plate
shall be constructed of a durable, weatherproof, rustproof, material. The
identification plate shall be permanently secured to the well casing or
enclosure floor around the casing where it is readily visible. The
identification plate shall be permanently marked to show:
(1) Company name and certification number of
the driller who installed the well;
(2) Date well was completed;
(3) Total depth (feet);
(4) Casing depth (feet);
(5) Screened Interval;
(6) Designator and/or identification
number.
e. Development.
Development shall be complete when the well produces water
typical of the aquifer being utilized.
f. Abandonment
(1) Permanent Direct Push Wells that do not
penetrate a confining layer shall be abandoned by removing all casing from the
subsurface and be grouted by forced injection through a tremie pipe from the
total depth to the land surface, or by forced injection or pouring of neat
cement, bentonite-cement, or 20% high solids sodium bentonite grout through a
tremie pipe starting at the bottom of the well and proceeding to the surface in
one continuous operation.
(2)
Direct Push Wells that penetrate a confining layer shall be abandoned by forced
injection or pouring of neat cement, bentonite-cement, or 20% high solids
sodium bentonite grout through a tremie pipe starting at the bottom of the well
and proceeding to the surface in one continuous operation.
Additional Requirements For Temporary Monitoring Wells
a. Construction and Materials
(1) Casing shall be of sufficient strength to
withstand normal forces encountered during and after well installation and be
composed of material so as to minimally affect water quality
analyses.
(2) Casing shall have a
sufficient diameter to provide access for sampling equipment.
(3) The monitoring well intake or screen
design shall minimize formational materials from entering the well. The filter
pack or intake shall be utilized opposite the well screen as appropriate so
that parameter analyses will be minimally affected.
b. Operation and Maintenance
All temporary monitoring wells shall be sealed with a
watertight cap or seal until abandoned. Temporary monitoring wells shall be
maintained such that they are not a source or channel of contamination before
they are abandoned.
c.
Abandonment.
(1) All temporary monitoring
wells shall be abandoned within 5 days of borehole completion.
(2) A conventionally drilled temporary well
shall be abandoned by forced injection of neat cement, bentonite-cement, or 20%
high solids sodium bentonite grout through a tremie pipe starting at the bottom
of the well and proceeding to the surface in one continuous
operation.
(3) A Temporary Direct
Push Well that does not penetrate a confining layer shall be abandoned by
forced injection of neat cement, bentonite-cement, or 20% high solids sodium
bentonite grout through a tremie pipe after the sampling device has been
removed.
(4) A Temporary Direct
Push Well that penetrates a confining layer shall be abandoned by forced
injection of neat cement, bentonite-cement, or 20% high solids sodium bentonite
grout through the sampling device as the sampling device is removed from the
sub-surface. Abandonment shall occur during the initial withdrawal from the
original push borehole and not by a separate tremie tool after the sampling
device has been removed to ensure the breech in the confining layer is
permanently sealed.
Use of Water Wells as Monitoring Wells.
Due to the variability involved, the use of a potable water
well as a monitoring well shall be approved by the Department on a case-by-case
basis.
Non-Standard Monitoring Wells
Due to the variability involved, the use of construction
methods, techniques, or monitoring well designs not covered in this regulation
shall be approved by the Department on a case-by-case basis.