S.D. Admin. R. 74:56:03:23 - Initial abatement requirements for corrective action for releases from AST systems
Initial abatement requirements for corrective action for releases are as follows:
(1) Upon confirmation of a
release, the owners or operators of AST systems shall undertake the following
initial abatement requirements for corrective action:
(a) Immediately report the release to the
designated state and local agencies;
(b) Stop any further release from the AST
system;
(c) Mitigate fire, safety,
and health hazards;
(d) If the
material was released to a secondary containment system, remove all released
materials within 24 hours or as determined by the department;
(e) Remediate all contaminated soil in
accordance with chapter 74:56:05;
(f) Report in writing to the department the
initial corrective action taken, including a verification of AST system repair
or closure if appropriate, within 20 days after confirmation or discovery of
the release;
(g) Conduct a
department-approved investigation to determine the possible presence of free
product and initiate free product removal in accordance with ยง
74:56:03:24;
(2) The owners or operators must assemble
from investigations of the site and the release the information considered
necessary by the department for completing the corrective action measures
required in subdivision (1) of this section. This information may include the
following:
(a) Data on the nature and
estimated quantity of the release;
(b) Data from surface and subsurface soil
sampling and analyses;
(c) Data for
groundwater or surface water sampling and analyses, or both;
(d) Data from available sources or site
investigations, or both, concerning surrounding populations, water quality and
use, well locations, subsurface soil conditions, climatological conditions, and
land usage; and
(e) The overall
extent, both vertically and horizontally, of the limits of
contamination;
(3) The
information collected by the owners or operators during the course of the
investigation under subdivision (2) of this section must be submitted to the
department according to the schedule established by the department. The
department may request the collection and submission of additional information
or a corrective action plan, or both, for additional cleanup of soil or waters
of the state.
Notes
General Authority: SDCL 34A-2-93, 34A-2-101.
Law Implemented: SDCL 34A-2-100, 34A-2-101.