Tenn. Comp. R. & Regs. 0780-02-13-.11 - LABELS
(1) The label shall be permanently attached
to each transportable modular building unit to demonstrate all components
accepted as having been manufactured in accordance with the standards. Modular
buildings reviewed under the Approved Construction Inspection program shall
have a label affixed by means of four (4) pop rivets or drive screws, on a
permanent non-removable building component in a visible location as shown on
the approved model building system. Modular buildings reviewed under
Commissioner 's Inspection Review Program shall have a label affixed to the
electrical panel box.
(2) The
Department will supply labels to approved construction inspection agencies upon
request. Each label will be numbered, and will bear the following statement:
This modular building unit or component has been manufactured
and inspected in accordance with the Tennessee Modular Building
(3) The approved
construction inspection agency and the manufacturer shall keep permanent
records of the handling of all labels. A copy of such records shall be sent to
the Department upon request. The records shall specify at least:
(a) The label number(s) attached to modular
building units or components;
(b)
Each unit or component to which a label has been attached, and the number of
such label;
(c) The disposition of
any damaged or rejected labels; and
(d) The location and custody of all unused
labels.
(4)
(a) The fee for each label to be attached to
a modular building unit or component shall be fifty dollars ($50.00).
(b) The fee for replacement of a lost,
damaged, or removed label shall be fifty dollars ($50.00) per label.
(c) The approved construction inspection
agency shall collect all label fees from the manufacturer before assigning
labels for attachment in a plant.
(d) Requests for labels shall be submitted
electronically. Label fees shall be submitted in a method acceptable to the
Department, which may include cash, check, money order or electronically. The
department may charge an internet payment processing fee, not to exceed two and
one half percent (2 1/2%), to those making payment over the Internet to be used
solely to defray the costs of any payments processed electronically.
(e) The approved construction inspection
agency shall forward all payment for labels to the Department within ten (10)
days after receipt of such payment.
(5)
(a)
Units and components shall be labeled at the time of construction prior to
leaving the manufacturing facility's production line, and prior to
being placed on the facility yard.
(b) Once a unit or component has been
labeled, no person may remove the label without obtaining prior authorization,
in writing, from the Department.
(c) Manufacturers operating more than one
facility may not transfer any labels without obtaining prior authorization, in
writing, from the Department.
Notes
Authority: T.C.A. ยงยง 68-102-113 and 68-126-305.
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.