12 Va. Admin. Code § 5-421-3595 - Conformance with approved procedures
If the commissioner or the commissioner's designee grants a variance as specified in 12VAC5-421-3570, or a HACCP plan is otherwise required as specified under 12VAC5-421-3620, the permit holder shall:
1. Comply with the HACCP plans
and procedures that are submitted as specified under
12VAC5-421-3630 and approved as a
basis for the variance;P and
2. Maintain and provide to the department,
upon request, records specified under subdivisions 4 and 5 c of
12VAC5-421-3630 that demonstrate
that the following are routinely employed:
a.
Procedures for monitoring the critical control
points;PF
b. Monitoring of the critical control
points;PF
c. Verification of the effectiveness of the
operation or process;PF and
d. Necessary corrective actions if there is
failure at the critical control point. PF
Notes
Statutory Authority: §§ 35.1-11 and 35.1-14 of the Code of Virginia.
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.