12 Va. Admin. Code § 5-590-531 - Reporting requirements for filtration treatment and disinfection treatment
TABLE 531.1 Microbial Toolbox Reporting Requirements |
||
TOOLBOX OPTION |
OWNERS SHALL SUBMIT THE FOLLOWING INFORMATION: |
ON THE FOLLOWING SCHEDULE: |
Alternative |
Verification that the |
No later than the applicable |
|
Monthly verification of the following: (i) Continuous basin operation; (ii) |
Monthly reporting within 10 days following the month in which the |
Two-stage lime softening |
Monthly verification of the following: (i) Chemical addition and hardness precipitation occurred in two separate and sequential softening stages before |
Monthly reporting within 10 days following the month in which the |
|
Initial demonstration of the following: (i) |
No later than the applicable |
If monthly average of daily maximum turbidity is greater than 1.0 NTU then the |
Report within 30 days following the month in which the |
|
Combined |
Monthly verification of CFE turbidity levels less than or equal to 0.15 NTU in at least 95% of the four-hour CFE measurements collected each month. |
Monthly reporting within 10 days following the month in which the |
Individual |
Monthly verification of the following: (i) Individual |
Monthly reporting within 10 days following the month in which the |
Demonstration of performance |
Results from testing following a protocol approved by the |
No later than the applicable |
As required by the |
Within 10 days following the month in which |
|
|
Demonstration that the following criteria are met: (i) Process meets the definition of bag or cartridge |
No later than the applicable |
Monthly verification that 100% of the |
Within 10 days following the month in which |
|
|
Results of verification testing demonstrating the following: (i) Removal efficiency established through challenge testing that meets criteria in subdivision B 5 of this section; and (ii) Integrity |
No later than the applicable |
Monthly report summarizing the following: (i) All direct integrity tests above the control limit; and (ii) If applicable, any turbidity or alternative indirect integrity |
Within 10 days following the month in which |
|
Second stage |
Monthly verification that 100% of flow was filtered through both stages and the first stage was preceded by a |
Within 10 days following the month in which |
|
Monthly verification that both a slow sand |
Within 10 days following the month in which |
Chlorine dioxide |
Summary of CT values for each |
Within 10 days following the month in which |
Ozone |
Summary of CT values for each |
Within 10 days following the month in which |
UV |
Validation |
No later than the applicable |
Monthly report summarizing the percentage of water entering the |
Within 10 days following the month in which |
Click here to view image
a = the value in subdivision C 3 a of this section.
b = the value in subdivision C 3 b of this section.
c = the value in subdivision C 3 c of this section.
d = the value in subdivision C 3 d of this section.
e = the value in subdivision C 3 e of this section.