9 Va. Admin. Code § 25-31-130 - Concentrated animal feeding operations
Current through Register Vol.. 38, No. 17, April 11, 2022
A. Permit requirement for CAFOs.
1. Concentrated animal feeding operations as
defined in
9VAC25-31-10 or
designated in accordance with subsection B of this section are point sources
that require VPDES permits for discharges. Once an operation is defined as a
CAFO, the VPDES requirements for CAFOs apply with respect to all animals in
confinement at the operation and all manure, litter and process wastewater
generated by those animals or the production of those animals, regardless of
the type of animal.
2. Two or more
animal feeding operations under common ownership are considered, for the
purposes of this chapter, to be a single animal feeding operation if they
adjoin each other or if they use a common area or system for the disposal of
wastes.
B. Case-by-case
designations. The board may designate any animal feeding operation as a
concentrated animal feeding operation upon determining that it is a significant
contributor of pollution to surface waters.
1.
In making this designation the board shall consider the following factors:
a. The size of the animal feeding operation
and the amount of wastes reaching surface waters;
b. The location of the animal feeding
operation relative to surface waters;
c. The means of conveyance of animal wastes
and process wastewaters into surface waters;
d. The slope, vegetation, rainfall, and other
factors affecting the likelihood or frequency of discharge of animal wastes and
process wastewaters into surface waters; and
e. Other relevant factors.
2. No animal feeding operation
with less than the numbers of animals set forth in the definition of Medium
CAFO in this regulation shall be designated as a concentrated animal feeding
operation unless:
a. Pollutants are
discharged into surface waters through a manmade ditch, flushing system, or
other similar manmade device; or
b.
Pollutants are discharged directly into surface waters which originate outside
of the facility and pass over, across, or through the facility or otherwise
come into direct contact with the animals confined in the
operation.
3. A permit
application shall not be required from a concentrated animal feeding operation
designated under this subsection until the board has conducted an on-site
inspection of the operation and determined that the operation should and could
be regulated under the VPDES permit program.
C. VPDES permit authorization.
1. Permit requirement. The owners or
operators of a CAFO shall not discharge unless the discharge is authorized by a
VPDES permit. In order to obtain authorization under a VPDES permit, the CAFO
owner or operator shall either apply for an individual VPDES permit or apply
for coverage under a VPDES general permit. The owners or operators of a CAFO
must have obtained authorization under the VPDES permit at the time that the
CAFO discharges.
2. Information to
submit with permit application. A permit application for an individual permit
must include the information specified in
9VAC25-31-100
J. A notice of intent for a general permit must include the information
specified in
9VAC25-31-100
J and
9VAC25-31-170.
3. Land application discharges from a CAFO
are subject to VPDES requirements. The discharge of manure, litter or process
wastewater to surface waters from a CAFO as the result of the application of
that manure, litter or process wastewater by the CAFO to land areas under its
control is a discharge from that CAFO subject to VPDES requirements, except
where it is an agricultural stormwater discharge as provided in
33
USC §
1362(14). For
purposes of this subdivision, where the manure, litter or process wastewater
has been applied in accordance with a nutrient management plan approved by the
Department of Conservation and Recreation and in accordance with site specific
nutrient management practices that ensure appropriate agricultural utilization
of the nutrients in the manure, litter, or process wastewater, as specified in
subdivisions E 1 f through i of
9VAC25-31-200,
a precipitation-related discharge of manure, litter or process wastewater from
land areas under the control of a CAFO is an agricultural stormwater discharge.
a. For unpermitted Large CAFOs, a
precipitation-related discharge of manure, litter, or process wastewater from
land areas under the control of a CAFO shall be considered an agricultural
stormwater discharge only where the manure, litter, or process wastewater has
been land applied in accordance with site-specific nutrient management
practices that ensure appropriate agricultural utilization of the nutrients in
the manure, litter, or process wastewater, as specified in subdivisions E 1 f
through i of
9VAC25-31-200.
b. Unpermitted Large CAFOs shall maintain
documentation specified in subdivision E 1 i of
9VAC25-31-200
either on site or at a nearby office, or otherwise make such documentation
readily available to department staff upon request.
4. Procedures for CAFOs seeking coverage
under a general permit. CAFO owners or operators shall submit a registration
statement when seeking authorization to discharge under a general permit in
accordance with subsection B of
9VAC25-31-170.
The board will review registration statements submitted by CAFO owners or
operators to ensure that the registration statement includes the information
required by subsection J of
9VAC25-31-100,
including a nutrient management plan that meets the requirements of subsection
E of
9VAC25-31-200
and applicable effluent limitations and standards, including those specified in
40 CFR Part 412. When additional information is necessary to complete the
registration statement or clarify, modify, or supplement previously submitted
material, the board may request such information from the owner or operator. If
the board makes a preliminary determination that the registration statement
meets the requirements of subsection J of
9VAC25-31-100
and subsection E of
9VAC25-31-200,
the board will notify the public of the board's proposal to grant coverage
under the permit to the CAFO and make available for public review and comment
the registration statement submitted by the CAFO, including the CAFO's nutrient
management plan, and the draft terms of the nutrient management plan to be
incorporated into the permit. The process for submitting public comments and
public hearing requests, and the public hearing process if a request for a
public hearing is granted, shall follow the procedures applicable to draft
permits set forth in
9VAC25-31-300,
9VAC25-31-310,
and
40
CFR 124.13. The board may establish, either
by regulation or in the general permit, an appropriate period of time for the
public to comment and request a public hearing that differs from the time
period specified in
9VAC25-31-290.
The board's response to significant comments received during the comment period
is governed by
9VAC25-31-320,
and, if necessary, the board will require the CAFO owner or operator to revise
the nutrient management plan in order to be granted permit coverage. When the
board authorizes coverage for the CAFO owner or operator under the general
permit, the terms of the nutrient management plan shall become incorporated as
terms and conditions of the permit for the CAFO. The board will notify the CAFO
owner or operator and inform the public that coverage has been authorized and
of the terms of the nutrient management plan incorporated as terms and
conditions of the permit applicable to the CAFO.
5. Changes to a nutrient management plan. Any
permit issued to a CAFO shall require the following procedures to apply when a
CAFO owner or operator makes changes to the CAFO's nutrient management plan
previously submitted to the board:
a. The
CAFO owner or operator shall provide the board with the most current version of
the CAFO's nutrient management plan and identify changes from the previous
version, except that the results of calculations made in accordance with the
requirements of subdivisions E 5 a (2) and E 5 b (4) of
9VAC25-31-200
are not subject to the requirements of this subdivision 5.
b. The board will review the revised nutrient
management plan to ensure that it meets the requirements of this section and
applicable effluent limitations and standards, including those specified in 40
CFR Part 412, and will determine whether the changes to the nutrient management
plan necessitate revision to the terms of the nutrient management plan
incorporated into the permit issued to the CAFO. If revision to the terms of
the nutrient management plan is not necessary, the board will notify the CAFO
owner or operator and upon such notification the CAFO may implement the revised
nutrient management plan. If revision to the terms of the nutrient management
plan is necessary, the board will determine whether such changes are
substantial changes as described in subdivision 5 c of this subsection.
(1) If the board determines that the changes
to the terms of the nutrient management plan are not substantial, the board
will make the revised nutrient management plan publicly available and include
it in the permit record, revise the terms of the nutrient management plan
incorporated into the permit, and notify the owner or operator and inform the
public of any changes to the terms of the nutrient management plan that are
incorporated into the permit.
(2)
If the board determines that the changes to the terms of the nutrient
management plan are substantial, the board will notify the public and make the
proposed changes and the information submitted by the CAFO owner or operator
available for public review and comment. The process for public comments,
public hearing requests, and the public hearing process if a public hearing is
held shall follow the procedures applicable to draft permits set forth in
9VAC25-31-300,
9VAC25-31-310,
and
40
CFR 124.13. The board may establish, either
by regulation or in the CAFO's permit, an appropriate period of time for the
public to comment and request a public hearing on the proposed changes that
differs from the time period specified in
9VAC25-31-290.
The board will respond to all significant comments received during the comment
period as provided in
9VAC25-31-320,
and require the CAFO owner or operator to further revise the nutrient
management plan if necessary, in order to approve the revision to the terms of
the nutrient management plan incorporated into the CAFO's permit. Once the
board incorporates the revised terms of the nutrient management plan into the
permit, the board will notify the owner or operator and inform the public of
the final decision concerning revisions to the terms and conditions of the
permit.
c. Substantial
changes to the terms of a nutrient management plan incorporated as terms and
conditions of a permit include:
(1) Addition
of new land application areas not previously included in the CAFO's nutrient
management plan. Except that if the land application area that is being added
to the nutrient management plan is covered by terms of a nutrient management
plan incorporated into an existing VPDES permit in accordance with the
requirements of subdivision E 5 of
9VAC25-31-200,
and the CAFO owner or operator applies manure, litter, or process wastewater on
the newly added land application area in accordance with the existing
field-specific permit terms applicable to the newly added land application
area, such addition of new land would be a change to the new CAFO owner or
operator's nutrient management plan but not a substantial change for purposes
of this section;
(2) Any changes to
the field-specific maximum annual rates for land application, as set forth in
subdivision E 5 a of
9VAC25-31-200,
and to the maximum amounts of nitrogen and phosphorus derived from all sources
for each crop, as set forth in subdivision E 5 b of
9VAC25-31-200;
(3) Addition of any crop or other uses not
included in the terms of the CAFO's nutrient management plan and corresponding
field-specific rates of application expressed in accordance with subdivision E
5 of
9VAC25-31-200;
and
(4) Changes to site-specific
components of the CAFO's nutrient management plan, where such changes are
likely to increase the risk of nitrogen and phosphorus transport to state
waters.
6.
Causes for modification of nutrient management plans. The incorporation of the
terms of a CAFO's nutrient management plan into the terms and conditions of a
general permit when a CAFO obtains coverage under a general permit in
accordance with subdivision C 4 of 9VAC25-31-130 and
9VAC25-31-170 is
not a cause for modification pursuant to the requirements of
9VAC25-31-370.
Notes
Statutory Authority: § 62.1-44.15 of the Code of Virginia; § 402 of the federal Clean Water Act; 40 CFR Parts 122, 123, 124, 403, and 503.