A.
Deadlines for submitting registration statement. Any operator seeking coverage
under this general permit, and that is required to submit a registration
statement, shall submit a complete and accurate general VPDES permit
registration statement in accordance with this section, which shall serve as a
notice of intent for coverage under the general VPDES permit for discharges of
stormwater from construction activities.
1.
New construction activities.
a. Any operator
proposing a new stormwater discharge from construction activities shall submit
a complete and accurate registration statement to the VSMP authority prior to
the commencement of land disturbance.
b. Any operator proposing a new stormwater
discharge from construction activities in response to a public emergency where
the related work requires immediate authorization to avoid imminent
endangerment to human health or the environment is authorized to discharge
under this general permit, provided that:
(1)
The operator submits a complete and accurate registration statement to the VSMP
authority no later than 30 days after commencing land disturbance;
and
(2) Documentation to
substantiate the occurrence of the public emergency is provided with the
registration statement.
c. Any operator proposing a new stormwater
discharge associated with the construction of a single-family detached
residential structure, within or outside a common plan of development or sale,
is authorized to discharge under this general permit and is not required to
submit a registration statement or the department portion of the permit
fee.
2. Existing
construction activities.
a. Any operator who
was authorized to discharge under the expiring or expired general permit and
who intends to continue coverage under this general permit shall:
(1) Submit a complete and accurate
registration statement to the VSMP authority at least 60 days prior to the
expiration date of the existing permit or a later submittal date established by
the board; and
(2) Update its
stormwater pollution prevention plan to comply with the requirements of this
general permit no later than 60 days after the date of coverage under this
general permit.
b. Any
operator with an existing stormwater discharge associated with the construction
of a single-family detached residential structure, within or outside a common
plan of development or sale that intends to continue coverage under this
general permit, is authorized to discharge under this general permit and is not
required to submit a registration statement or the department portion of the
permit fee, provided that the operator updates its stormwater pollution
prevention plan to comply with the requirements of this general permit no later
than 60 days after the date of coverage under this general permit.
3. For stormwater discharges from
construction activities where the operator changes, the new operator shall
submit a complete and accurate registration statement or transfer agreement
form and any other documents deemed necessary by the VSMP authority to the VSMP
authority to demonstrate transfer of ownership and long-term maintenance
responsibilities for stormwater management facilities, as required, has
occurred prior to assuming operational control over site specifications or
commencing work on-site.
4. Late
notifications. Operators are not prohibited from submitting registration
statements after commencing land disturbance. When a late registration
statement is submitted, authorization for discharges shall not occur until
coverage under the general permit is issued. The VSMP authority, department,
board, and the EPA reserve the right to take enforcement action for any
unpermitted discharges that occur between the commencement of land disturbance
and discharge authorization.
5.
Late registration statements. Registration statements for existing facilities
covered under subdivision A 2 a of this section will be accepted after the
expiration date of this permit, but authorization to discharge will not be
retroactive. The VSMP authority, department, board, and the EPA reserve the
right to take enforcement action for any unpermitted discharges that occur
after existing permit coverage expires and prior to coverage under this permit
is approved.
B.
Registration statement. The operator shall submit a registration statement to
the VSMP authority that contains the following information:
1. Name, contact, mailing address, telephone
number, and email address if available of the construction activity operator.
No more than one operator may receive coverage under each registration
statement;
NOTE: General permit coverage will be issued to this
operator, and the certification in subdivision 17 of this subsection shall be
signed by the appropriate person associated with this operator as described in
Part III K of
9VAC25-880-70.
2. Name and physical location address of the
construction activity, when available, to be covered under this general permit,
including city or county, and latitude and longitude in decimal degrees (six
digits - ten-thousandths place);
3.
A site map (in a 8.5 inch by 11 inch format) showing the location of the
existing or proposed land-disturbing activities for which the operator is
seeking permit coverage, the limits of land disturbance, construction
entrances, on-site support activities, and all water bodies receiving
stormwater discharges from the site;
4. If offsite support activities will be
used, the name and physical location address, when available, of those offsite
support activities, including city or county; latitude and longitude in decimal
degrees (six digits - ten-thousandths place); and whether or not the offsite
support activity will be covered under this general permit or a separate VPDES
permit;
5. Status of the
construction activity: federal, state, public, or private;
6. Nature of the construction activity (e.g.,
commercial, industrial, residential, agricultural, oil and gas,
etc.);
7. If stormwater management
plans for the construction activity have been approved by an entity with
department approved annual standards and specifications, the name of the entity
with the department approved annual standards and specifications. A copy of the
annual standard and specification entity form shall be submitted with the
registration statement;
8. If the
construction activity was previously authorized to discharge under the general
permit effective July 1, 2014, the date of erosion and sediment control plan
approval for the estimated area to be disturbed by the construction activity
during this permit term;
9. If the
construction activity was previously authorized to discharge under the general
permit effective July 1, 2014, whether land disturbance has
commenced;
10. Name of the
receiving waters and sixth order Hydrologic Unit Code (HUC);
11. If the discharge is through a municipal
separate storm sewer system (MS4), the name of the MS4 operator;
12. Estimated project start date and
completion date;
13. Total land
area of development and estimated area to be disturbed by the construction
activity during this permit term (to the nearest one-hundredth of an
acre);
14. Whether the area to be
disturbed by the construction activity is part of a larger common plan of
development or sale;
15. If
nutrient credits are to be used to demonstrate compliance with the water
quality technical criteria as allowed in
9VAC25-870-65
F, a letter of availability from an appropriate nutrient bank that nonpoint
source nutrient credits are available;
16. A stormwater pollution prevention plan (SWPPP) shall be
prepared in accordance with the requirements of the General VPDES Permit for
Stormwater Discharges from Construction Activities prior to submitting the
registration statement. By signing the registration statement the operator
certifies that the SWPPP has been prepared; and
17. The following certification: "I certify under penalty of
law that I have read and understand this registration statement and that this
document and all attachments were prepared in accordance with a system designed
to assure that qualified personnel properly gathered and evaluated the
information submitted. Based on my inquiry of the person or persons who manage
the system or those persons directly responsible for gathering the information,
the information submitted is to the best of my knowledge and belief true,
accurate, and complete. I am aware that there are significant penalties for
submitting false information including the possibility of fine and imprisonment
for knowing violations."