9 Va. Admin. Code § 5-40-8410 - Monitoring
A. The provisions
of 9VAC5-40-40(Monitoring)
apply.
B. Periodic monitoring of
letterpress printing operations shall be conducted as follows:
1. The temperature of a catalytic or thermal
oxidation control device shall be monitored at least once every 15 minutes
while the printing process is operating, and that temperature shall be recorded
by an analog or digital recording device.
a.
For a catalytic oxidizer, the dryer exhaust temperature upstream of the
catalyst bed shall be monitored and recorded.
b. For a thermal oxidizer, the combustion
chamber temperature of the oxidizer shall be monitored and recorded.
2. Catalyst bed material in a
catalytic oxidation control device shall be inspected annually for general
catalyst condition and any signs of potential catalyst depletion. Sampling and
evaluation of the catalyst bed material shall be conducted whenever the results
of the inspection indicate signs of potential catalyst depletion or poor
catalyst condition based on manufacturer's recommendations, but not less than
once per year.
3. If a heatset web
letterpress printing process is interlocked to ensure that the control device
is operating and airflow is present when the printing process is operating,
then periodic monitoring of dryer air flow is not required. If no interlock is
present, then the printing process dryer air flow shall be verified and
recorded once per operating day.
Notes
Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act (40 CFR Parts 51 and 60).
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.