A significant intent in the revision of the rule was to
distinguish between commodities and solid waste, and to curb the potential for
the speculative accumulation of large amounts of waste disguised as recycling.
Stakeholders suggested and ecology concurs it is reasonable to recycle half of
incoming material on an annual basis. We revised Table 210A to reflect that
requirement, which also better aligns WAC
173-350-210 with the standards in
WAC 173-350-320 for the temporary accumulation of wastes in piles. Compliance
with the requirements in chapter 173-345 WAC is obligatory for applicable
operations, and ecology included a reference on request.
The amount of waste residual allowable in source-separated
materials is limited to five percent under the adopted rule. In Table 210A,
ecology had eliminated weight as a metric, in favor of volume, but stakeholders
pointed out that the metric depends on the kind of material. Ecology returned
weight as an appropriate measure, in addition to volume. This standard
determines whether a permit may be required, and is not a threshold for
determining whether the material is a solid waste.
We revised subsections (4) and (5)(a) of WAC
173-350-210 to reflect that
existing elements of a facility do not necessarily need to be documented in the
same manner as proposed new elements or existing elements that are proposed to
be modified. The revision also clarifies that an engineer does not have to
prepare every document.
In subsection (4)(g) of WAC
173-350-210 we further specified
that leachate collection must extend to areas other than the tipping floor if
leachate is likely to be generated. This revision is necessary to ensure
compliance with state water quality rules.
We revised subsection (6) of WAC
173-350-210 to accommodate local
jurisdictional health department approval of operations that may desire or need
to have extended hours of operation when an attendant is not on site.
(1)
Recycling and material recovery
facilities -Applicability.
(a) These
standards apply to recycling and material recovery facilities.
(b) These standards do not apply to:
(i) Storage or treatment of solid waste in
outdoor piles subject to WAC
173-350-320;
(ii) Storage or recycling of solid waste in
surface impoundments subject to WAC
173-350-330;
(iii) Composting facilities subject to WAC
173-350-220;
(iv) Solid waste that is beneficially used
and approved in accordance with the procedures of WAC
173-350-200 or
173-350-230;
(v) Storage of waste tires prior to recycling
subject to WAC
173-350-350;
(vi) Storage of moderate risk waste prior to
recycling subject to WAC
173-350-360;
(vii) Energy recovery or incineration of
solid waste subject to WAC
173-350-240;
(ix) Other organic materials handling subject
to WAC
173-350-225;
(x) Drop boxes used solely for collecting
recyclable materials subject to WAC
173-350-310;
(xi) Treatment of contaminated soils or
contaminated dredge material indoors subject to WAC
173-350-490.
(2)
Recycling and material
recovery facilities - Permit exemptions. In accordance with
RCW
70.95.305, recycling and material recovery
facilities managed in accordance with the terms and conditions of Table 210-A
of this subsection are exempt from solid waste handling permitting. If a
facility does not operate in compliance with the terms and conditions
established for an exemption under this subsection, the facility may be subject
to the permitting requirements for solid waste handling under this chapter. In
addition, violations of the terms and conditions of this subsection may be
subject to the enforcement provisions of
RCW
70.95.315.
Table 210-A
Terms and Conditions for Solid Waste Permit
Exemption
|
|
Waste Materials
|
Specific Requirements for Activity or
Operation
|
|
(1)
|
Cured concrete or wood waste at point of generation
|
(a) Meet the performance standards of WAC
173-350-040; and (b)Recycle and
use materials back on-site.
|
|
(2)
|
Comingled brick, cured, concrete, or asphaltic
materials
|
(a) Meet the performance standards of WAC
173-350-040;
(b) Recycle or ship for recycling at least fifty
percent of all incoming material annually;
(c) Comply with all applicable requirements of chapter
173-345 WAC, Recyclable materials-Transporter and facility requirements;
(d) Allow inspections by the department or
jurisdictional health department at reasonable times;
(e) Thirty days prior to operation, facilities must
submit a notification of intent to operate as a conditionally exempt facility
to the jurisdictional health department and the department. Notice of intent
must be submitted on a form provided by the department and must be complete;
and
(f) Prepare and submit an annual report to the
jurisdictional health department and the department by April 1st on forms
supplied by the department. The annual report must detail material recovery or
recycling activities during the previous calendar year and must include the
following information:
(i) Name and address of the operation;
(ii) Calendar year covered by the report;
(iii) Annual quantities and types of waste received,
recovered or recycled, and disposed, in tons;
(iv) Destination of materials; and
(v) Any additional information required by the
department.
|
|
(3)
|
Source-separated recyclable materials
|
(a) Meet the performance standards of WAC
173-350-040; and
(b) Accept only wastes segregated into individual
material streams. Examples of individual material streams are loads composed
solely of cardboard, mattresses, or metal of one type or several types. More
than one individual material stream may be accepted at the same facility, but
mixed waste materials, including commingled recyclable materials, may not be
accepted under this exemption;
(c) Dispose of an incidental and accidental residual
not to exceed five percent of weight or volume of the total waste received per
year or per load, whichever is more stringent;
(d) Manage the operation to prevent the attraction of
vectors; (e)Recycle or ship for recycling at least fifty percent of all
incoming material annually; (f)Comply with all applicable requirements of
chapter 173-345 WAC, Recyclable materials-Transporter and facility
requirements;
(g) Allow inspections by the department or
jurisdictional health department at reasonable times;
(h) Thirty days prior to operation, facilities must
submit a notification of intent to operate as a conditionally exempt facility
to the jurisdictional health department and the department. Notice of intent
must be submitted on a form provided by the department and must be complete;
and
(i) Prepare and submit an annual report to the
jurisdictional health department and the department by April 1st on forms
supplied by the department. The annual report must detail material recovery or
recycling activities during the previous calendar year and must include the
following information:
(i) Name and address of the operation;
(ii) Calendar year covered by the report;
(iii) Annual quantities and types of waste received,
recovered or recycled, and disposed, in tons;
(iv) Destination of materials; and
(v) Any additional information required by the
department.
|
(3)
Recycling and material recovery facilities - Permit requirements -
Location. There are no specific location standards for recycling and
material recovery facilities subject to permitting under this chapter; however,
recycling and material recovery facilities must meet the performance standards
of WAC
173-350-040.
(4)
Recycling and material recovery
facilities - Permit requirements - Design. Recycling and material
recovery facilities must be designed so that the facilities can be operated to
meet the performance standards of WAC
173-350-040, and the following
design standards:
(a) Control public access,
and prevent unauthorized vehicular traffic and illegal dumping of
waste;
(b) Be sturdy and
constructed of easily cleanable materials;
(c) Provide effective means to control
rodents, insects, birds, and other vectors;
(d) Provide effective means to control litter
including, but not limited to, orientation of the tipping floor in a manner
that prevents prevailing winds from moving waste outside the collection area
when other structures are not in place to prevent this;
(e) Provide a tip floor made of impervious
material such as concrete or asphalt to prevent soil and groundwater
contamination. The surface must be durable enough to withstand equipment. The
jurisdictional health department may approve other types of surfaces if the
applicant can demonstrate that it will prevent soil and groundwater
contamination;
(f) Cover the
tipping floor to protect it from precipitation;
(g) Convey leachate from the tipping floor
and any ancillary areas likely to collect leachate, such as wash down areas, to
a surface impoundment, tank, or sanitary sewer, or use other methods approved
by the jurisdictional health department to prevent uncontrolled
discharge;
(h) Provide for
stormwater runoff collection and discharge from a twenty-five-year
storm;
(i) Provide pollution
control measures to protect air quality; and
(j) Provide all-weather surfaces for
vehicular traffic.
(5)
Recycling and material recovery facilities - Permit requirements -
Documentation.
(a) The owner or
operator must submit facility drawings and construction documents for, at a
minimum, any proposed addition or modification of elements described in
subsection (4) of this section to the jurisdictional health department for
review and approval. The facility drawings and construction documents for
proposed construction of engineered features must be prepared by a professional
engineer registered in the state of Washington, and must include:
(i) An engineering report that presents the
design basis and calculations for the engineered features. The engineering
report must demonstrate that the proposed design will meet the performance
standards of WAC
173-350-040;
(ii) Scale drawing of the facility including
the location and size of waste handling areas, fixed equipment, buildings,
stormwater management features where applicable, access roads, traffic
patterns, and other constructed areas and buildings integral to facility
operation;
(iii) Design
specifications for the engineered features of the facility as applicable;
and
(iv) For new construction, a
construction quality assurance plan that describes monitoring, testing, and
documentation procedures that will be performed during construction of the
facility, to ensure the facility is constructed in accordance with the approved
design.
(b) The owner or
operator must provide copies of the construction record drawings for engineered
features at the facility and a report documenting facility construction,
including the results of observations and any testing carried out as part of
the construction quality assurance plan, to the jurisdictional health
department and the department. The owner or operator must not commence
operation in a newly constructed portion of the facility until the
jurisdictional health department has determined that the construction was
completed in accordance with the approved engineering report/plans and
specifications and has approved the construction documentation in
writing.
(6)
Recycling and material recovery facilities - Permit requirements -
Operating. The owner or operator of a recycling or material recovery
facility must:
(a) Operate the site in
compliance with the performance standards of WAC
173-350-040 and this
subsection. In addition the owner or operator must develop, keep, and follow a
plan operation approved as part of the permitting process. The plan of
operation must be available for inspection at the request of the jurisdictional
health department. If necessary, the plan must be modified with the approval,
or at the direction of the jurisdictional health department. Each plan of
operation must include the following:
(i) A
description of the types of waste materials to be handled at the
facility;
(ii) A description of the
procedures used to ensure that dangerous waste and other unacceptable waste are
not accepted at the facility;
(iii)
A description of how waste materials are to be handled on-site, including
recycling or recovery, storage, maximum site capacity, method of adding or
removing waste materials from the facility, and equipment used;
(iv) A description of how the owner or
operator will ensure the facility is operated in a way to:
(A) Control litter, dust, and nuisance
odors;
(B) Control rodents,
insects, and other vectors;
(C)
Provide attendant(s) on-site during hours of operation. Materials may be
transferred after hours without an attendant on-site if other controls approved
by the jurisdictional health department are in place;
(D) Provide a sign at the site entrance that
identifies the facility and shows at a minimum the name of the site;
(E) Immediately summon fire, police, or
emergency service personnel in the event of an emergency;
(F) Remove or otherwise manage leachate from
containment structure(s) to prevent soil and/or groundwater
contamination;
(G) Remove waste
materials from the tipping floor at a frequency approved by the jurisdictional
health department; and
(H) Ensure
that handling of waste capable of attracting birds does not pose an aircraft
safety hazard.
(v) A
description of how operators will inspect and maintain the facility to prevent
malfunctions, deterioration, operator errors, and discharges that may cause or
lead to the release of wastes to the environment or a threat to human health,
including the inspection form operators will use. Inspections must be conducted
as needed, but at least weekly, unless an alternate schedule is approved by the
jurisdictional health department as part of the permitting process;
(vi) A description of how operators will
maintain operating records on the amounts (weight or volume) and types of waste
received and removed from the facility, including the form or computer printout
used to record this information. Facility annual reports must be maintained in
the operating record. Facility inspection reports must be maintained in the
operating record, including at least the date of inspection, the name and
signature of the inspector, a notation of observations made, and the date and
nature of any needed repairs or remedial action. Significant deviations from
the plan of operation must be noted in the operating record. Records must be
kept for a minimum of five years and must be available upon request by the
jurisdictional health department;
(vii) Safety and emergency plans;
and
(viii) Other details to
demonstrate that the facility will be operated in accordance with this
subsection and as required by the jurisdictional health department.
(b) Prepare and submit an annual
report to the jurisdictional health department and the department by April 1st
on forms supplied by the department. The annual report must detail recycling or
material recovery activities during the previous calendar year and must include
the following information:
(i) Name and
address of the recycling or material recovery operation;
(ii) Calendar year covered by the
report;
(iii) Annual quantities and
types of waste received, recovered or recycled, and disposed, in
tons;
(iv) Destination of material;
and
(v) Any additional information
required by the jurisdictional health department as a condition of the
permit.
(7)
Recycling and material recovery facilities - Permit requirements -
Groundwater monitoring. There are no specific groundwater monitoring
requirements for recycling and material recovery facilities subject to this
chapter; however, recycling and material recovery facilities must meet the
performance standards of WAC
173-350-040.
(8)
Recycling and material recovery
facilities - Permit requirements - Closure. The owner or operator of a
recycling or material recovery facility must develop, keep, and follow a
closure plan that includes:
(a) Notification
to the jurisdictional health department sixty days in advance of
closure;
(b) Removal of all waste
material to a facility that conforms with the applicable regulations for
handling the waste; and
(c) Methods
of removing waste material.
(9)
Recycling and material recovery
facilities - Permit requirements - Financial assurance. There are no
specific financial assurance requirements for recycling and material recovery
facilities subject to this chapter; however, recycling and material recovery
facilities must meet the performance standards of WAC
173-350-040.
(10)
Recycling and material recovery
facilities - Permit application contents. The owner or operator of a
recycling or material recovery facility must obtain a solid waste permit from
the jurisdictional health department. All applications for permits must be
submitted according to the procedures established in WAC
173-350-710. In addition to the
requirements of WAC
173-350-710 and
173-350-715, each application for
a permit must contain:
(a) Engineering
reports/plans and specifications that address the standards of subsections (4)
and (5) of this section;
(b) A plan
of operation meeting the applicable requirements of subsection (6) of this
section;
(c) A closure plan meeting
the requirements of subsection (8) of this section; and
(d) Any additional information required by
written notification of the jurisdictional health department.