(1)
Composting facilities - Applicability.
(a) These standards apply to all facilities
that treat solid waste by composting.
(b) These standards do not apply to:
(i) Methods of managing organic materials
that are excluded from the solid waste handling standards in WAC
173-350-020;
(ii) Composting used as a treatment for
contaminated soil or contaminated dredged material regulated under WAC
173-350-320 or
173-350-490;
(iii) Anaerobic digesters regulated under WAC
173-350-250, or treatment of
other liquid or solid wastes in digesters regulated under WAC
173-350-330;
(iv) Composting of bovine and equine
carcasses for producers subject to
RCW
70.95.306. Producers that fail to meet the
conditions of
RCW
70.95.306 will be required to obtain a solid
waste handling permit from the jurisdictional health department and must comply
with all other conditions of this chapter; and
(v) Composting biosolids when managed under
chapter
173-308 WAC, Biosolids management.
(2)
Composting facilities - Permit
exemptions. In accordance with
RCW
70.95.305, conditionally exempt facilities
composting materials and volumes in Table 220-A must meet the conditions listed
in Table 220-A, and (a) through (e) of this subsection to be conditionally
exempt from solid waste handling permitting. Feedstocks not listed in Table
220-A must be approved by the department and jurisdictional health department.
For the purposes of this subsection, "material on-site at any one time"
includes feedstocks, active composting, curing piles, and composted materials.
An owner or operator that does not comply with the terms and conditions of
Table 220-A and (a) of this subsection is required to obtain a permit from the
jurisdictional health department and must comply with all other applicable
requirements of this chapter. Violations of the terms and conditions of Table
220-A and (a) of this subsection may be subject to the enforcement provisions
of RCW
70.95.315.
Table 220-A
Terms and Conditions for Solid Waste Permit
Exemptions
|
Organic Materials
|
Volume
|
Specific Requirements for Activity or
Operation
|
|
(1)
|
All organic feedstocks
|
No more than 5,000 gallons or 25 cubic yards of
material on-site at any one time.
|
No notification, reporting or testing requirements.
|
|
(2)
|
All organic feedstocks
|
Greater than 25 but no more than 250 cubic yards of
material on-site at any one time, not to exceed 1,000 cubic yards in a calendar
year.
|
(a) Thirty days prior to operation, facilities must
submit a notification of intent to operate as a conditionally exempt facility
to the jurisdictional health department and the department. Notice of intent
must be submitted on a form provided by the department;
(b) Facilities that distribute composted material
off-site must meet the following conditions:
(i) Manage the operation to reduce pathogens to meet
limits set by Table 220-B;
(ii) Conduct compost analysis according to the
requirements of Table 220-B. Compost testing frequency is based on volume of
compost produced annually as required by subsection (4)(a)(x)(B) of this
section; and
(iii) Submit annual reports and results of composted
material analysis to the department and the jurisdictional health department by
April 1st of each calendar year. Annual reports must be submitted on forms
provided by the department.
|
|
(3)
|
Yard debris Crop residues Manure and bedding Bulking
agents
|
Greater than 25 but no more than 500 cubic yards of
material on-site at any one time, not to exceed 2,500 cubic yards processed in
a calendar year.
|
(a) Thirty days prior to operation, facilities must
submit a notification of intent to operate as a conditionally exempt facility
to the jurisdictional health department and the department. Notice of intent
must be submitted on a form provided by the department.
(b) Facilities that distribute composted materials
off-site must meet the following conditions:
(i) Manage the operation to reduce pathogens to meet
limits set by Table 220-B;
(ii) Conduct compost analysis according to the
requirements of Table 220-B. Compost testing frequency is based on volume of
compost produced annually as required by subsection (4)(a)(x)(B) of this
section; and
(iii) Submit annual reports and results of composted
material analysis to the department and the jurisdictional health department by
April 1st of each calendar year. Annual reports must be submitted on forms
provided by the department.
|
|
(4)
|
Agricultural wastes Yard debris Bulking agents
|
Greater than 25 but no more than 1,000 cubic yards of
agricultural wastes and bulking agents on-farm at any one time, and up to 50%
of organic materials on-farm can be yard debris.
|
Agricultural farms managing more than 25 cubic yards
of imported yard debris on-site at any one time or composting only agricultural
wastes but that distribute off-site must meet the following conditions:
(a) Thirty days prior to operation, facilities must
submit a notification of intent to operate as a conditionally exempt facility
to the jurisdictional health department and the department. Notification must
be submitted on a form provided by the department;
(b) If agricultural farm is only managing agricultural
waste and not distributing composted material off farm, then notification in
(4)(a) of this table is not required;
(c) Facilities that distribute composted material
off-site must meet the following conditions:
(i) Manage operation to reduce pathogens to meet
limits set by Table 220-B of this section;
(ii) Conduct compost analysis according to the
requirements of Table 220-B. Compost testing frequency is based on volume of
compost produced annually as required by subsection (4)(a)(x)(B) of this
section; and
(iii) Submit annual reports and results of composted
material analysis to the department and the jurisdictional health department by
April 1st of each calendar year. Annual reports must be submitted on forms
provided by the department.
|
|
(5)
|
Agricultural wastes Manure and bedding from zoos
Bulking agents
|
Greater than 25 cubic yards with no upper limits when
only agricultural wastes, manure and bedding from zoos, and bulking agents are
processed on-farm, or on-site for zoos.
|
Agricultural farms that distribute composted material
off-farm, or off-site for zoos, must meet the following conditions:
(a) Thirty days prior to operation, facilities must
submit a notification of intent to operate as a conditionally exempt facility
to the jurisdictional health department and the department. Notification must
be submitted on a form provided by the department;
(b) For composting at a dairy, composting must occur
as part of an updated dairy nutrient management plan as required by chapter
90.64 RCW, Dairy Nutrient Management Act;
(c) For composting at a farm other than a dairy,
composting must occur as part of an updated farm management plan written in
conjunction with a conservation district, a qualified engineer, or other
agricultural professional able to certify that the plan meets applicable
conservation practice standards in the USDA Washington Field Office
Technical Guide, Code 317, produced by the Natural Resources
Conservation Service;
(d) Facilities that distribute composted material
off-site must meet the following conditions:
(i) Manage the operation to reduce pathogens to meet
limits set by Table 220-B of this section;
(ii) Conduct compost analysis according to the
requirements of Table 220-B. Compost testing frequency is based on volume of
compost produced annually as required by subsection (4)(a)(x)(B) of this
section; and
(iii) Submit annual reports and results of composted
material analysis to the department and the jurisdictional health department by
April 1st of each calendar year. Annual reports must be submitted on forms
provided by the department.
|
(a) Comply with the
performance standards of WAC
173-350-040;
(b) Manage the operation to prevent the
migration of agricultural pests identified by local horticultural pest and
disease control boards, as applicable;
(c) Control nuisance odors to prevent
migration beyond property boundaries;
(d) Manage the operation to prevent
attraction of flies, rodents, and other vectors; and
(e) Allow the department or the
jurisdictional health department to inspect the site at reasonable times.
(3)
Composting facilities -
Permit requirements - Location. There are no specific location standards
for composting facilities subject to this chapter; however, composting
facilities must meet the performance standards of WAC
173-350-040.
|
Note:
|
When considering compost facility location, please
review the U.S. Department of Transportation Federal Aviation Advisory
Circular. No. 150/5200-33B 2007.
|
(4)
Composting facilities - Permit
requirements - Design. Composting facilities must be designed and
constructed to meet the requirements of this subsection.
(a) Composting facilities must be designed
and constructed such that:
(i) The facility
can be operated to meet the performance standards of WAC
173-350-040; and
(ii) The facility can be operated to promote
controlled, aerobic decomposition. This requirement is intended to ensure that
compost facility designers take into account porosity, nutrient balance, pile
oxygen, pile moisture, pile temperature, and retention time of composting when
designing a facility. It is not intended to mandate forced aeration or any
other specific composting technology.
(b) The owner or operator of a composting
facility must prepare and provide to the jurisdictional health department
engineering reports, engineering plans, and engineering specifications that
address the design standards of this subsection. The engineering documents must
be prepared by a professional engineer registered in the state of Washington,
and must include:
(i) An engineering report
that presents the design basis and calculations for the engineered features of
the facility including, but not limited to: Pad, impoundments, stormwater
management features, leachate management features, and aeration and emission
control features as required by the permitting air authority where applicable.
The engineering report must demonstrate that the proposed design will meet the
performance standards of this chapter;
(ii) Scale drawings of the facility including
the location and size of feedstock and composted material storage areas,
compost processing areas, fixed equipment, buildings, storm-water management
features where applicable, access roads, traffic patterns, and other
constructed areas and buildings integral to facility operation;
(iii) Design specifications for the
engineered features of the facility including, but not limited to, pads,
stormwater management features, leachate management features, and aeration and
emission management features as required by a permitting air authority where
applicable; and
(iv) A construction
quality assurance plan that describes monitoring, testing, and documentation
procedures that will be performed during construction of the facility to ensure
the facility is constructed in accordance with the approved design.
(c) When operations require public
access, all-weather roads must be provided from the highway or roads to and
within the compost facility and must be designed and maintained to prevent
traffic congestion, traffic hazards, dust, and noise pollution.
(d) Compost facilities must manage stormwater
and leachate to meet the standards of this section and of any and all federal,
state, and local water and air quality permits.
(e) Composting facilities must minimize the
production of leachate and runoff by designing stormwater management features
such as run-on prevention systems, which may include covered areas (roofs),
diversion swales, ditches, or other features designed to divert stormwater from
areas of feedstock preparation, active composting, and curing.
(i) Composting facilities must manage any
leachate generated at the facility by providing leachate management features.
The leachate management features include, but are not limited to, leachate
collection, conveyance, and storage structures, or treatment systems. Leachate
must be collected from areas of feedstock storage and preparation, active
composting, and curing, and be conveyed to a leachate storage structure or
treatment system. Any discharges to ground that result in contaminants
migrating to groundwater require a waste discharge permit under chapter 90.48
RCW, Water pollution control, prior to discharge. Discharges to ground that
result in degradation of groundwater quality are prohibited under chapter 90.48
RCW, Water pollution control. Any discharge to sanitary sewer requires
additional permitting by the local delegated authority or department;
(ii) Stormwater and leachate collection and
conveyance structures must be designed based on the volume of water resulting
from a twenty-five-year storm event;
(iii) Leachate storage structures such as
ponds or tanks must be of adequate capacity to store the normal maximum volume
of leachate generated by the facility. The normal maximum volume will be
established based on the following conditions:
(A) Facility design;
(B) Normal climatic precipitation and
evaporation data for the location of the facility;
(C) Monthly leachate reuse or removal;
and
(D) A factor of safety to
accommodate variability of actual conditions from normal conditions.
(iv) Leachate holding ponds and
tanks must be designed according to the following:
(A) Leachate ponds at registered dairies must
meet Natural Resources Conservation Service standards for a waste storage
facility in the 2001 (revised June 2011) Washington Field Office
Technical Guide (Code 313).
(B) Leachate ponds at composting facilities
other than registered dairies must be designed to meet the following
requirements:
(I) Have a liner consisting of a
minimum 30-mil thickness geomembrane on a subgrade that provides sufficient
bearing capacity to support the liner and the contents of the pond. A liner
constructed with a high density polyethylene geomembrane must be at least
60-mil thick to allow for proper welding. The jurisdictional health department
may approve the use of an alternative liner design if the owner or operator can
demonstrate during the permitting process that the proposed design will prevent
migration of solid waste constituents or leachate into the ground or surface
waters at least as effectively as the liners described in this
subsection;
(II) Have dikes and
slopes designed to maintain their structural integrity under conditions of a
leaking liner and capable of withstanding erosion from wave action,
overfilling, or precipitation;
(III) Have freeboard (distance between the
liquid level and the top of the pond) equal to or greater than eighteen inches
to avoid overtopping from wave action, overfilling, or precipitation. The
jurisdictional health department may reduce the freeboard requirement if other
engineering controls are in place that prevent overtopping. These engineering
controls must be specified during the permitting process; and
(IV) Leachate ponds that have the potential
to impound more than ten-acre feet (three million two hundred fifty-nine
thousand gallons) of liquid measured from the top of the dike and which would
be released by a failure of the containment dike must be reviewed and approved
by the dam safety section of the department.
(C) Tanks used to store leachate must meet
design standards in WAC
173-350-330(4)(b).
(f) Incoming feedstocks,
active composting, and curing materials must be placed on pads that prevent
contamination of soil or groundwater underlying or adjacent to the pads. Pads
must meet the following requirements:
(i) All
pads must be curbed or graded in a manner to prevent ponding, to control run-on
and runoff, and to separately collect and convey all stormwater and leachate to
separate storage or holding systems. Stormwater that is combined with leachate
must be managed as leachate in accordance with this section;
(ii) All pads must be constructed on
subgrades that provide sufficient bearing capacity to support the weight of the
pad, the materials placed on them, and the equipment used in handling the
materials;
(iii) The entire surface
area of the pad must be designed to maintain its structural and hydraulic
integrity against loads resulting from any machinery used for feedstock and
compost handling activities, and from surface wear or damage caused by
feedstock and compost handling, or by active composting at the
facility;
(iv) The pad may be
constructed of materials such as concrete (with sealed joints), asphaltic
concrete, or soil cement that prevents subsurface soil and groundwater
contamination; and
(v) The
jurisdictional health department may allow pads for compost facilities to be
designed and constructed with materials other than those listed in (f)(iv) of
this subsection, provided the applicant demonstrates in the engineering report
to the jurisdictional health department's and the department's satisfaction
that the alternative pad provides sufficient protection to meet the performance
standards of this section and of WAC
173-350-040.
(5)
Composting
facilities -
Permit requirements - Documentation. Within
thirty days of completing construction, the owner or operator of a composting
facility must provide copies of the construction record drawings for engineered
features at the facility and a report documenting facility construction,
including the results of observations and testing carried out as part of the
construction quality assurance plan, to the jurisdictional health department
and the department. Facilities must not begin operating until the
jurisdictional health department has determined that the construction was
completed in accordance with the approved engineering report, plans, and
specifications and has approved the construction documentation in writing. The
jurisdictional health department has thirty days after receiving complete
construction records to provide its determination.
(6)
Composting facilities - Permit
requirements - Operating. The owner or operator of a composting facility
must:
(a) Operate the facility to:
(i) Control air contaminants such as dust and
nuisance odors to prevent other contaminants from migrating beyond property
boundaries in accordance with WAC
173-350-040(3);
(ii) Prevent the attraction of
vectors;
(iii) Prevent the
migration of agricultural pests identified by local pest and disease control
boards, as applicable;
(iv) Ensure
access to the facility is restricted when the facility is closed;
(v) Ensure that only feedstocks identified in
the approved plan of operation are accepted at the facility;
(vi) Ensure the facility operates under the
supervision and control of a properly trained individual(s) during all hours of
operation:
(A) Facility supervisors
responsible for daily operation must receive training, or be able to document
prior training, in the basics of composting within the first year of
supervising the facility. Training must consist of classroom and hands-on
course work and conclude with a certificate of completion that must be kept
on-site at all times. Appropriate compost training can be obtained through
organizations such as the Washington organic recycling council, the Solid Waste
Association of North America, the U.S. Composting Council, or other training as
approved by the jurisdictional health department; and
(B) Ensure facility employees are trained in
appropriate facility operations, maintenance procedures, and safety and
emergency procedures according to individual job duties and according to an
approved plan of operation. A trained supervisor may provide appropriate
training to employees responsible for daily operations.
(vii) Implement and document pathogen
reduction activities. Documentation must include compost pile temperatures
representative of the composting materials, and notation of turnings as
appropriate, based on the composting method used. Pathogen reduction activities
must at a minimum include the following:
(A)
In vessel composting - The temperature of the active compost pile must be
maintained at fifty-five degrees Celsius (one hundred thirty-one degrees
Fahrenheit) or higher for three consecutive days (seventy-two hours);
or
(B) Aerated static pile must
have a cover such as a synthetic material or a layer of finished compost to
ensure that pathogen reduction temperatures are reached and vectors are
controlled. The temperature of the active compost pile must be maintained at
fifty-five degrees Celsius (one hundred thirty-one degrees Fahrenheit) or
higher for three consecutive days (seventy-two hours); or
(C) Windrow composting - The temperature of
the active compost pile must be maintained at fifty-five degrees Celsius (one
hundred thirty-one degrees Fahrenheit) or higher for fifteen days or longer.
During the period when the compost is maintained at fifty-five degrees Celsius
(one hundred thirty-one degrees Fahrenheit) or higher, there must be a minimum
of five turnings of the windrow; or
(D) An alternative method of composting that
can be demonstrated by the owner or operator to achieve an equivalent reduction
of human pathogens.
(viii) Monitor the composting process
according to the plan of operation submitted during the permitting process.
Monitoring must include inspection of incoming loads of feedstocks and pathogen
reduction requirements of (a)(vii) of this subsection;
(ix) Collect composted material samples for
analysis that are representative of the pile. Use a sampling method such as
described in the U.S. Composting Council 2002 Test Methods for the Examination
of Composting and Compost, Method 02.01-A through E; and
(x) Analyze composted material for metals and
other testing parameters listed in Table 220-B.
(A) The jurisdictional health department may
require additional tests for metals and contaminants;
(B) Testing frequency is based on amount of
composted material produced. A representative sample of composted material must
be tested for every 5,000 cubic yards produced, or every three hundred
sixty-five days, whichever is more frequent. The jurisdictional health
department may modify the frequency of testing based on historical data for a
particular facility;
(C) Composted
material meeting the conditions of subsection (6)(a)(x) and (g) of this section
can be stored off of a pad.
Table 220-B
Testing Parameters
|
Metals and other testing
parameters
|
Limit (mg/kg dry weight), unless
otherwise specified
|
| Arsenic |
[LESS THAN EQUALS TO] 20 ppm |
| Cadmium |
[LESS THAN EQUALS TO] 10 ppm |
| Copper |
[LESS THAN EQUALS TO] 750 ppm |
| Lead |
[LESS THAN EQUALS TO] 150 ppm |
| Mercury |
[LESS THAN EQUALS TO] 8 ppm |
| Molybdenum |
[LESS THAN EQUALS TO] 9 ppm |
| Nickel |
[LESS THAN EQUALS TO] 210 ppm |
| Selenium |
[LESS THAN EQUALS TO] 18 ppm |
| Zinc |
[LESS THAN EQUALS TO] 1400 ppm |
| Physical
contaminants1
|
[LESS THAN EQUALS TO] 1 percent by weight
total, not to exceed .25 percent film plastic by weight |
| Sharps |
0 |
| pH |
5 - 10 (range) |
| Biological
stability2
|
Moderately unstable to very stable |
| Fecal coliform3
|
< 1,000 Most Probable Number per gram of
total solids (dry weight) |
| OR |
|
| Salmonella |
< 3 Most Probable Number per 4 grams of
total solids (dry weight) |
|
1A label or information
sheet must be provided with compost that exceeds .1 percent by weight of film
plastic. See WAC
173-350-220(6)(f)(iii)(D)(I).
|
|
2Tests for biological
stability must be done as outlined in the United States Composting Council Test
Methods for the Examination of Composting and Compost unless otherwise approved
by the jurisdictional health department.
|
|
3Test for either fecal
coliform or salmonella.
|
|
Note:
|
Biosolids composters regulated under this chapter
must communicate with the jurisdictional health department to determine if
different testing parameters and testing frequencies are required.
|
(b) Inspect the facility to prevent
malfunctions and deterioration, operator errors and discharges that may cause
or lead to the release of waste to the environment or a threat to human health.
Inspections must be conducted at least weekly, unless an alternate schedule is
approved by the jurisdictional health department as part of the permitting
process.
(c) For compost facilities
with leachate holding ponds, conduct regular liner inspections at least once
every five years, unless an alternate schedule is approved by the
jurisdictional health department as part of the permitting process. The
frequency of inspections must be specified in the operations plan and must be
based on the type of liner, expected service life of the material, and the
site-specific service conditions:
(i) Inspect
the liner for degradation and ruptures of the liner material and for failure of
any seams or joints in the liner material. If the maximum wetted extent of the
liner geomem-brane cannot be directly inspected visually, then the liner must
be tested for leaks by electrical leak detection survey methods. If leaks,
degradation, or ruptures of the liner material are detected, the liner must be
repaired; and
(ii) The
jurisdictional health department must be given sufficient notice and have the
opportunity to be present during liner inspections. An inspection record must
be kept at the facility or other convenient location if permanent office
facilities are not on-site, for at least five years from the date of
inspection. Inspection records must be available to the jurisdictional health
department upon request.
(d) Maintain operating records of the
following:
(i) Daily temperatures
representative of compost piles;
(ii) Additional process monitoring data as
prescribed in the plan of operation;
(iii) Results of analyses for composted
materials as required in (a)(x) of this subsection and Table 220-B;
and
(iv) Facility inspection
reports must be maintained in the operating record. Significant deviations from
the plan of operation must be noted in the operating record. Records must be
kept for a minimum of five years and must be available upon request by the
jurisdictional health department.
(e) Prepare and submit an annual report to
the jurisdictional health department and the department by April 1st of each
calendar year on forms provided by the department. The annual report must
detail the facility's activities during the previous calendar year and must
include the following information:
(i) Name
and address of the facility;
(ii)
Calendar year covered by the report;
(iii) Annual quantity and type of feedstocks
received and compost produced, in cubic yards or tons;
(iv) Annual quantity of composted material
sold or distributed, in cubic yards or tons;
(v) Annual summary of laboratory analysis of
composted material; and
(vi) Any
additional information required by the jurisdictional health department as a
condition of the permit.
(f) Develop, keep, and follow a plan of
operation approved as part of the permitting process. The plan of operation
must convey to site personnel the concept of operation intended by the
designer. The plan of operation must be kept on-site and be available for
inspection at the request of the jurisdictional health department. If
necessary, the plan must be modified with the approval, or at the direction of
the jurisdictional health department. Each plan of operation must include the
following:
(i) List of feedstocks to be
composted, including a general description of the source of feedstocks.
Feedstocks must be approved by the department or jurisdictional health
department;
(ii) A plan to control
air contaminants such as dust and nuisance odors to prevent contaminants from
migrating beyond property boundaries in accordance with WAC
173-350-040(3),
including:
(A) A description of how staff will
document and respond to nuisance odor complaints should they arise. The plan
must include date and time of complaints, weather conditions, and operations at
the facility at the time of the complaint, and a summary of actions
taken;
(B) A description of
facility and operational features to prevent nuisance odors beyond the
facility's property boundary, as determined by the jurisdictional health
department, the department, or the air authority. The description must address
the receiving, composting, curing, and storage areas of the facility;
(C) A description of facility maintenance
activities that encompass nuisance odor prevention and control, such as
acquiring critical odor control backup equipment in the event of a breakdown, a
schedule for purging aeration lines and changing biofilter media as
appropriate, and a schedule for cleaning leachate ponds or leachate storage
tanks as appropriate; and
(D) A
description of how feedstocks with high moisture or the potential for high
odors will be managed to reduce nuisance odors upon receipt, and through the
composting process.
(iii) A description of how wastes and organic
materials including incoming feedstocks, composting, curing, and composted
materials are to be handled on-site during the facility's active life,
including:
(A) Maximum site capacity in cubic
yards for all materials on-site at any one time. The jurisdictional health
department may require cumulative capacity for materials or separate capacities
for incoming feedstocks, composting, curing, and composted materials, or any
combination;
(B) Processing
capacity in tons or cubic yards of solid waste feedstocks processed in a given
amount of time. The jurisdictional health department may require monthly or
annual processing capacity;
(C)
Procedures and criteria for ensuring that only the feedstocks described will be
accepted. This includes a plan for rejecting feedstocks contaminated with
greater than five percent physical contaminants by volume, or a plan to accept
and separate contaminated loads from noncontaminated loads, and reduce physical
contaminants to an acceptable level prior to composting;
(D) Procedure to reduce physical contaminants
in composted material to meet testing parameters in Table 220-B. Grinding to
reduce the size of physical contaminants does not meet the requirements of this
section;
(I) Compost facilities must provide
a label or information sheet to purchasers of compost that exceeds .1 percent
film plastic by weight but does not exceed .25 percent film plastic by weight.
The label or information sheet must include the statement in subsection
(4)(f)(iii)(D)(II) of this section, or equivalent language approved by
jurisdictional health department or the department.
(II) "This compost does not meet Department
of Ecology standards for film plastic content for unrestricted use. This
compost may only be used in locations where a means of removing or containing
the film plastic on-site is put in place promptly after use. Acceptable
controls include removal from the site, incorporation, planting, covering with
soil or another media, or containment in a compost sock or similar device. This
product may not be used adjacent to regulated waters of the state (e.g.,
wetlands, streams, lakes) or in environmentally sensitive areas."
(E) Procedures for handling
unacceptable wastes;
(F) A
discussion on types and amounts of feedstocks including basic calculations
showing that the facility will be able to achieve an acceptable mix of
materials for efficient decomposition;
(G) Material flow plan describing general
procedures to manage all materials on-site from incoming feedstock to composted
material;
(H) A description of
equipment, including equipment to add water to compost as necessary;
(I) Compost process monitoring plan,
including compost mix (carbon to nitrogen ratio), temperature, moisture, and
porosity;
(J) Pathogen reduction
plan;
(K) Representative sampling
and analysis plan for the composted material such as described in the 2002 U.S.
Composting Council Test Methods for the Examination of Composting and Compost
Method 02.01-A through E;
(L)
Leachate management plan, including monthly precipitation and evaporation data,
and if applicable, monthly leachate reuse or removal; and
(M) Stormwater management plan.
(iv) A description of how
equipment, structures, and other systems are to be inspected and maintained,
including the frequency of inspections and inspection logs;
(v) A description of how facility staff will
receive appropriate training in the operation of the facility, including how
they will be trained to identify nuisance odors and how to correct
them;
(vi) A community relations
plan describing how the owner or operator will document and manage
complaints;
(vii) Safety, fire, and
emergency plans;
(viii) Forms for
recordkeeping of daily volumes or weights of incoming feedstocks by type,
outgoing composted material, and process monitoring results; and
(ix) Other details to demonstrate that the
facility will be operated in accordance with this subsection and as required by
the jurisdictional health department.
(g) Manage composted material piles that have
met the testing parameters in Table 220-B in the following manner:
(i) Comply with the performance standards of
WAC
173-350-040;
(ii) Minimize and control runoff from
composted material piles through the use of covers, diversion swales, berms,
ditches, or other features designed to prevent runoff and divert stormwater
from compost material; and
(iii)
Minimize odor by maintaining porosity of composted material piles and managing
moisture levels in composted material piles, not to exceed sixty percent
moisture.
(7)
Composting facilities - Permit requirements - Groundwater
monitoring. There are no specific groundwater monitoring requirements
for composting facilities subject to this chapter; however, composting
facilities must meet the performance standards of WAC
173-350-040.
(8)
Composting facilities - Permit
requirements - Closure. The owner or operator of a composting facility
must:
(a) Notify the jurisdictional health
department sixty days in advance of closure. At closure, the facility owner or
operator is financially responsible for the removal of all solid waste,
including but not limited to, raw or partially composted feedstocks, composted
material and leachate from the facility. The materials must be sent to another
facility that complies with the applicable regulations for handling the waste;
and
(b) Develop, keep, and follow a
closure plan approved by the jurisdictional health department as part of the
permitting process. At a minimum, the closure plan must include methods of
removing solid waste, leachate, and other organic materials from the facility.
For planning purposes, assume that the facility is at full, permitted site
capacity at the time of closure.
(9)
Composting facilities - Permit
requirements - Financial assurance. There are no specific financial
assurance requirements for composting facilities subject to this chapter;
however, composting facilities must meet the performance standards of WAC
173-350-040.
(10) Composting facilities - Permit
application contents. The owner or operator of a composting facility
must obtain a solid waste permit from the jurisdictional health department. All
applications for permits must be submitted in accordance with the procedures
established in WAC
173-350-710. In addition to the
requirements of WAC
173-350-710 and
173-350-715, each application for
a permit must contain:
(a) Engineering
reports, plans, and specifications that address the design standards of
subsections (4) and (5) of this section;
(b) A plan of operation meeting the
requirements of subsection (6) of this section; and
(c) A closure plan meeting the requirements
of subsection (8) of this section.
(11)
Composting facilities -
Designation of composted materials. When used on-site or distributed
off-site, composted materials meeting the testing parameters of Table 220-B are
no longer subject to this chapter. Composted materials that do not meet these
requirements are solid waste and subject to management under chapter 70.95 RCW,
Solid waste management- Reduction and recycling.