Wash. Admin. Code § 173-420-070 - Air quality analysis procedures
(1) Air quality analysis for transportation
plans, programs, and projects shall be modeled for criteria pollutants using
EPA and the federal Department of Transportation approved methods.
(2) Air quality analysis procedures and
methodology used in determining conformity for transportation plans and
improvement programs shall be determined through consultation with the MPO, the
United States Department of Transportation and the Environmental Protection
Agency, the state departments of ecology and transportation, the local air
authority, and other interested representatives of the public. The consultation
procedure for SIP and maintenance plan development in the applicable SIP shall
be used for the consultation process required by this section. The consultation
process shall also be used for determining research and data collection
efforts, and regional transportation model development, events that will
trigger new conformity determinations, the status of TCMs, significant changes
in project design and scope, and projects which require PM10 analysis. The
specific analysis procedures and methodology selected shall comply with this
chapter, the federal transportation conformity regulation ( 40 C.F.R. Part 51
Subpart T), and the applicable SIP. Agreement on the methods and assumptions
including modeling parameters, model accuracy, and the base year against which
alternatives are compared, shall be reached on all programs and plans prior to
the conformity determination. Procedures, methodologies, and input parameters
shall be reviewed and updated at least once every two years under the direction
of the departments of ecology and transportation. Such review shall occur prior
to conformity determination of transportation plan or TIP revisions.
(3) Procedures, methodologies, and
assumptions for project analysis shall be consistent with those procedures,
methodologies, and assumptions developed for analysis of transportation plans
and improvement programs in subsection (2) of this section.
(4) Each MPO shall conduct conformity
analyses of the transportation plan and improvement program developed in its
region.
(5) The lead agency shall
be responsible for project conformity analysis.
(6) The impact of preferred alternative
transportation plans, improvement programs, and projects shall be quantified
and compared for compliance to the SIP requirements, and the requirements of
WAC 173-420-060, and
173-420-065. If modeling does not
indicate that the requirements of this section are met, mitigating measures
shall be required and the plan, improvement program, or project remodeled. All
else being equal, the alternative with the lowest concentration shall be chosen
over all other alternatives.
Notes
Statutory Authority: Chapter 70.94 RCW and 40 C.F.R. Part 51 Subpart T. 95-18-022 (Order 94-31), § 173-420-070, filed 8/25/95, effective 9/25/95. Statutory Authority: Chapter 70.94 RCW and RCW 70.94.037. 93-04-006 (Order 92-07), § 173-420-070, filed 1/22/93, effective 2/22/93.
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.