Wash. Admin. Code § 173-420-090 - Transportation improvement program conformity
(1) This section applies to all
transportation improvement programs that authorize purchase of right of way or
that fund construction of projects on the regional transportation system within
a metropolitan area boundary of any region that is contained either wholly or
partially in a nonattainment area for each criteria pollutant. The metropolitan
planning organization that has responsibility for such a program shall complete
all program modeling as required herein and shall conduct an analysis to
determine conformity with the current SIP. After a conformity finding by the
MPO, the TIP shall be submitted to the United States Department of
Transportation for federal conformity determination.
(2) The current SIP is the plan that has been
adopted by the department of ecology and submitted to the United States
Environmental Protection Agency. Upon adoption of a new state implementation
plan, a MPO may use the previous SIP for up to ninety days when making
conformity determinations on new TIPs. Ninety days after adoption of a new SIP,
MPOs shall use the current SIP when making conformity determinations for new
TIPs.
(3) Transportation
improvement programs shall comply with WAC
173-420-060. After the attainment
year, projects contained in a transportation program shall not cause any
violations of the NAAQS. Transportation improvement programs shall be
consistent with a conforming transportation plan as described in WAC
173-420-080. Local improvement
programs that are consistent with a conforming regional TIP are deemed to
comply with this chapter provided that the requirements of WAC
173-420-050 are met.
(4) Metropolitan planning organizations shall
update TIP conformity findings whenever the TIP is updated. Projects that are
no longer current to the program, or that are no longer intended to begin
construction within the period of the program, shall be removed from the
conformity analysis.
(5)
Transportation improvement programs that have been approved and found to
conform to the state implementation plan before adoption of this chapter need
not be updated until two years after the enactment of this chapter.
(6) The lead agency of each transportation
project on the regional transportation system within the MPO's jurisdiction
shall submit sufficient documentation to support the MPO's modeling efforts.
This documentation shall include design speed, anticipated speed limit, number
of lanes, and lane capacity as relevant for all transportation projects that
must comply with WAC
173-420-100 and that are not
exempted under WAC
173-420-110.
(7) The TIP shall include the status of each
transportation control measure in the state implementation plan as an attached
appendix. All transportation control measures shall be scheduled for
implementation and funded for completion before the proposed attainment
demonstration date for each criteria pollutant. Projects in the transportation
improvement program shall not interfere with or cause a delay in the
implementation of a transportation control measure. Those transportation
control measures that are no longer viable shall be documented and removed from
the status report.
Notes
Statutory Authority: Chapter 70.94 RCW and RCW 70.94.037. 93-04-006 (Order 92-07), § 173-420-090, filed 1/22/93, effective 2/22/93.
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.