Wash. Admin. Code § 246-282-070 - Construction and maintenance
(1) All
owners and persons in charge of shellfish operations must arrange their
physical facilities to aid in the flow of shellfish products through all
handling, processing, and storage areas in a manner that will minimize
contamination of the shellfish.
(2)
Any owner of a shellfish operation must submit to the department for
consultation properly prepared plans and specifications of physical facilities
for shellfish processing or sanitation activities at least thirty days before
the facilities are:
(a) Originally
constructed;
(b) Converted from
another use; or
(c) Extensively
remodeled to the extent that a plan for a building permit is required by the
city or county where located.
(3) The department will review properly
prepared plans and specifications of physical facilities for shellfish
processing or sanitation activities required by subsection (2) of this section
within thirty days of receipt and provide technical assistance to the owner of
the shellfish operation regarding whether the proposed physical facilities
would meet the requirements of this chapter.
Notes
Statutory Authority: RCW 69.30.030 and 43.20.030. 01-04-054, § 246-282-070, filed 2/5/01, effective 3/8/01. Statutory Authority: RCW 43.20.050. 91-02-051 (Order 124B), recodified as § 246-282-070, filed 12/27/90, effective 1/31/91. Statutory Authority: RCW 69.30.030. 78-08-059 (Order 163), § 248-58-060, filed 7/24/78; Regulation 58.060, effective 3/11/60.