Wash. Admin. Code § 246-330-510 - Design, construction review, and approval of plans
(1) Drawings and specifications for new
construction, must be prepared by, or under the direction of, an architect
registered under chapter 18.08 RCW. The services of a consulting engineer
registered under chapter 18.43 RCW must be used for the various branches of the
work where appropriate. The services of a registered professional engineer may
be used in lieu of the services of an architect if work involves engineering
only.
(2) An ambulatory surgical
facility must submit construction documents for proposed new construction to
the department for review and approval prior to new construction as required in
RCW
70.230.050(1)(b).
(3) The facility must submit:
(a) A written functional program containing,
at a minimum:
(i) Information concerning
surgical services to be provided and operational methods to be used;
and
(ii) Description of work,
patient, soiled waste and clean processing flows.
(b) Two sets of construction drawings and
specifications to include coordinated civil, architectural, structural,
mechanical, fire sprinkler, fire alarm and electrical work. Each room, area,
and item of fixed equipment and major movable equipment must be identified on
all drawings to demonstrate that the required facilities for each function are
provided.
(c) Floor plan of the
building showing the alterations and additions including location of any
service or support areas.
(d) For
additions and/or alterations:
(i) A plan to
show how the ambulatory surgical facility will ensure the health and safety of
occupants during construction and installation of finishes. This includes
taking appropriate infection control measures, keeping the surrounding area
free of dust and fumes, and assuring rooms or areas are well-ventilated,
unoccupied, and unavailable for use until free of volatile fumes and
odors.
(ii) A plan to show how the
ambulatory surgical facility will provide safety during construction consistent
with the fire code showing required paths of egress, exit discharge and interim
life safety measures serving the alterations or additions.
(4) An ambulatory surgical
facility must:
(a) Respond to requests for
additional or corrected documents;
(b) Submit to the department for review and
approval any addenda or modifications to the original department approved
construction documents;
(c) Assure
construction is completed in compliance with the final "department approved"
documents; and
(d) Notify the
department when construction is completed and provide a copy of the local
jurisdiction's approval for occupancy if requested by the department.
(5) An ambulatory surgical
facility will not use any new construction, alterations or additions until:
(a) The construction documents are approved
by the department; and
(b) The
local jurisdictions have issued an approval to occupy; and
(c) Notification to the department that the
construction has been completed, the proposed occupancy date, final declared
construction cost and that any additional fees have been paid.
Notes
Statutory Authority: Chapter 70.230 RCW. 09-09-032, § 246-330-510, filed 4/7/09, effective 5/8/09.
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.