Wash. Admin. Code § 296-104-115 - Inspection - What will be done when defective conditions are concealed by covering?

If upon an external inspection there is evidence of a leak or crack, enough of the covering of the boiler or unfired pressure vessel shall be removed to satisfy the inspector in order to determine the safety of the boiler or unfired pressure vessel. If the covering cannot be removed at the time, the inspector may order the operation of the boiler or unfired pressure vessel stopped until such time as the covering can be removed and proper examination made.

Notes

Wash. Admin. Code § 296-104-115

Statutory Authority: RCW 70.79.030 and 70.79.040. 99-22-026, § 296-104-115, filed 10/26/99, effective 11/26/99; 95-19-058, § 296-104-115, filed 9/15/95, effective 10/16/95; Part III, § 4, filed 3/23/60.

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.