(1) Methods of
compliance, the following engineering controls and work practices of this
section must be used for construction work defined in WAC
296-155-012
and for all ship repair defined in WAC
296-304-010.
(2) Engineering controls and work practices
for all operations covered by this section. The employer must use the following
engineering controls and work practices in all operations covered by this
section, regardless of the levels of exposure:
(a)
Vacuum cleaners equipped with HEPA filters to collect all debris
and dust containing ACM and PACM, except as provided in subsection (10)(b) of
this section in the case of roofing material.
(b) Wet methods, or wetting agents, to
control employee exposures during asbestos handling, mixing, removal, cutting,
application, and cleanup, except where employers demonstrate that the use of
wet methods is infeasible due to, for example, the creation of electrical
hazards, equipment malfunction, and, in roofing, except as provided in
subsection (10)(b) of this section.
(c)
Asbestos must be handled, mixed, applied, removed, cut, scored,
or otherwise worked in a wet saturated state to prevent the emission of
airborne fibers unless the usefulness of the product would be diminished
thereby.
(d) Prompt cleanup and
disposal of wastes and debris contaminated with asbestos in leak-tight
containers except in roofing operations, where the procedures specified in this
section apply.
(3) In
addition to the requirements of subsection (2) of this section, the employer
must use the following control methods to achieve compliance with the TWA
permissible exposure limit and excursion limit prescribed by WAC
296-62-07705:
(a) Local exhaust ventilation equipped with
HEPA filter dust collection systems;
(b)
Enclosure or isolation of processes producing asbestos
dust;
(c) Ventilation of the
regulated area to move contaminated air away from the breathing zone of
employees and toward a filtration or collection device equipped with a HEPA
filter;
(d) Use of other work
practices and engineering controls that the department can show to be
feasible;
(e) Wherever the
feasible engineering and work practice controls described above are not
sufficient to reduce employee exposure to or below the permissible exposure
limit and/or excursion limit prescribed in WAC
296-62-07705,
the employer must use them to reduce employee exposure to the lowest levels
attainable by these controls and must supplement them by the use of respiratory
protection that complies with the requirements of WAC
296-62-07715.
(4) Prohibitions. The following
work practices and engineering controls must not be used for work related to
asbestos or for work which disturbs ACM or PACM, regardless of measured levels
of asbestos exposure or the results of initial exposure assessments:
(a) High-speed abrasive disc saws that are
not equipped with point or cut ventilator or enclosures with HEPA filtered
exhaust air;
(b) Compressed air
used to remove asbestos, or materials containing asbestos, unless the
compressed air is used in conjunction with an enclosed ventilation system
designed to capture the dust cloud created by the compressed air;
(c) Dry sweeping, shoveling or other dry
cleanup of dust and debris containing ACM and PACM;
(d) Employee rotation as a means of reducing
employee exposure to asbestos.
(5)
Cleanup.
(a) After completion
of asbestos work (removal, demolition, and renovation operations), all surfaces
in and around the work area must be cleared of any asbestos debris.
(b) Encapsulant must be applied to all areas
where asbestos has been removed to ensure binding of any remaining
fibers.
(6) Class I
requirements. The following engineering controls and work practices and
procedures must be used:
(a) All Class I
work, including the installation and operation of the control system must be
supervised by a competent person as defined in WAC
296-62-07703;
(b) For all Class I jobs involving the
removal of more than twenty-five linear or ten square feet of thermal system
insulation or surfacing material; for all other Class I jobs, where the
employer cannot produce a negative exposure assessment according to WAC
296-62-07709(3),
or where employees are working in areas adjacent to the regulated area, while
the Class I work is being performed, the employer must use one of the following
methods to ensure that airborne asbestos does not migrate from the regulated
area:
(i) Critical barriers must be placed
over all the openings to the regulated area, except where activities are
performed outdoors; or
(ii) The
employer must use another barrier or isolation method which prevents the
migration of airborne asbestos from the regulated area, as verified by
perimeter area surveillance during each work shift at each boundary of the
regulated area, showing no visible asbestos dust; and perimeter area monitoring
showing that clearance levels contained in 40 C.F.R. Part
763, Subpart E, of
the EPA Asbestos in Schools Rule are met, or that perimeter area levels,
measured by Phase Contrast Microscopy (PCM) are no more than background levels
representing the same area before the asbestos work began. The results of such
monitoring must be made known to the employer no later than twenty-four hours
from the end of the work shift represented by such monitoring. Exception: For
work completed outdoors where employees are not working in areas adjacent to
the regulated areas, (a) of this subsection is satisfied when the specific
control methods in subsection (7) of this section are used;
(c) For all Class I jobs, HVAC
systems must be isolated in the regulated area by sealing with a double layer
of 6 mil plastic or the equivalent;
(d)
For all Class I jobs, impermeable dropcloths must be placed on
surfaces beneath all removal activity;
(e)
For all Class I jobs, all objects within the regulated area must
be covered with impermeable dropcloths or plastic sheeting which is secured by
duct tape or an equivalent;
(f)
For all Class I jobs where the employer cannot produce a negative exposure
assessment, or where exposure monitoring shows that a PEL is exceeded, the
employer must ventilate the regulated area to move contaminated air away from
the breathing zone of employees toward a HEPA filtration or collection
device.
(7) Specific
control methods for Class I work. In addition, Class I asbestos work must be
performed using one or more of the following control methods according to the
limitations stated below:
(a) Negative
pressure enclosure (NPE) systems: NPE systems may be used where the
configuration of the work area does not make the erection of the enclosure
infeasible, with the following specifications and work practices:
(i) Specifications:
(A)
The negative pressure enclosure (NPE) may be of any
configuration;
(B) At least 4 air
changes per hour must be maintained in the NPE;
(C) A minimum of -0.02 column inches of
water pressure differential, relative to outside pressure, must be maintained
within the NPE as evidenced by manometric measurements;
(D) The NPE must be kept under negative
pressure throughout the period of its use; and
(E) Air movement must be directed away from
employees performing asbestos work within the enclosure, and toward a HEPA
filtration or collection device.
(ii)
Work practices:
(A) Before
beginning work within the enclosure and at the beginning of each shift, the NPE
must be inspected for breaches and smoke-tested for leaks, and any leaks
sealed.
(B) Electrical circuits in
the enclosure must be deactivated, unless equipped with ground-fault circuit
interrupters.
(b)
Glove bag systems may be used to remove PACM and/or ACM from
straight runs of piping and elbows and other connections with the following
specifications and work practices:
(i)
Specifications:
(A) Glove bags must be made
of 6 mil thick plastic and must be seamless at the bottom.
(B) Glove bags used on elbows and other
connections must be designed for that purpose and used without
modifications.
(ii)
Work practices:
(A) Each glove bag must be
installed so that it completely covers the circumference of pipe or other
structure where the work is to be done.
(B)
Glove bags must be smoke-tested for leaks and any leaks sealed
prior to use.
(C) Glove bags may
be used only once and may not be moved.
(D)
Glove bags must not be used on surfaces whose temperature exceeds
150°F.
(E) Prior to disposal,
glove bags must be collapsed by removing air within them using a HEPA
vacuum.
(F) Before beginning the
operation, loose and friable material adjacent to the glove bag/box operation
must be wrapped and sealed in two layers of six mil plastic or otherwise
rendered intact.
(G) Where system
uses attached waste bag, such bag must be connected to collection bag using
hose or other material which must withstand pressure of ACM waste and water
without losing its integrity.
(H)
Sliding valve or other device must separate waste bag from hose to ensure no
exposure when waste bag is disconnected.
(I)
At least two persons must perform Class I glove bag removal
operations.
(c)
Negative pressure glove bag systems. Negative pressure glove bag
systems may be used to remove ACM or PACM from piping.
(i)
Specifications: In addition to specifications for glove bag
systems above, negative pressure glove bag systems must attach HEPA vacuum
systems or other devices to bag during removal.
(ii) Work practices:
(A) The employer must comply with the work
practices for glove bag systems in this section.
(B) The HEPA vacuum cleaner or other device
used during removal must run continually during the operation until it is
completed at which time the bag must be collapsed prior to removal of the bag
from the pipe.
(C) Where a
separate waste bag is used along with a collection bag and discarded after one
use, the collection bag may be reused if rinsed clean with amended water before
reuse.
(d)
Negative pressure glove box systems: Negative pressure glove boxes may be used
to remove ACM or PACM from pipe runs with the following specifications and work
practices:
(i) Specifications:
(A) Glove boxes must be constructed with
rigid sides and made from metal or other material which can withstand the
weight of the ACM and PACM and water used during removal.
(B) A negative pressure generator must be
used to create negative pressure in the system.
(C) An air filtration unit must be attached
to the box.
(D) The box must be
fitted with gloved apertures.
(E)
An aperture at the base of the box must serve as a bagging outlet for waste ACM
and water.
(F) A back-up generator
must be present on site.
(G) Waste
bags must consist of 6 mil thick plastic double-bagged before they are filled
or plastic thicker than 6 mil.
(ii)
Work practices:
(A) At least
two persons must perform the removal.
(B)
The box must be smoke-tested for leaks and any leaks sealed prior
to each use.
(C) Loose or damaged
ACM adjacent to the box must be wrapped and sealed in two layers of 6 mil
plastic prior to the job, or otherwise made intact prior to the job.
(D) A HEPA filtration system must be used to
maintain pressure barrier in box.
(e) Water spray process system. A water
spray process system may be used for removal of ACM and PACM from cold line
piping if, employees carrying out such process have completed a forty-hour
separate training course in its use, in addition to training required for
employees performing Class I work. The system must meet the following
specifications and must be performed by employees using the following work
practices:
(i) Specifications:
(A) Piping must be surrounded on three sides
by rigid framing.
(B) A 360 degree
water spray, delivered through nozzles supplied by a high pressure separate
water line, must be formed around the piping.
(C) The spray must collide to form a fine
aerosol which provides a liquid barrier between workers and the ACM and
PACM.
(ii) Work
practices:
(A) The system must be run for at
least ten minutes before removal begins.
(B)
All removal must take place within the water barrier.
(C) The system must be operated by at least
three persons, one of whom must not perform removal, but must check equipment,
and ensure proper operation of the system.
(D)
After removal, the ACM and PACM must be bagged while still inside
the water barrier.
(f)
A small walk-in enclosure which accommodates no more than two
persons (mini-enclosure) may be used if the disturbance or removal can be
completely contained by the enclosure with the following specifications and
work practices:
(i) Specifications:
(A) The fabricated or job-made enclosure
must be constructed of 6 mil plastic or equivalent.
(B) The enclosure must be placed under
negative pressure by means of a HEPA filtered vacuum or similar ventilation
unit.
(C) Change room. A small
change room made of 6-mil-thick polyethylene plastic should be contiguous to
the mini-enclosure, and is necessary to allow the worker to vacuum off their
protective coveralls and remove them before leaving the work area. While inside
the enclosure, the worker should wear Tyvek disposable coveralls or equivalent
and must use the appropriate HEPA-filtered dual cartridge respiratory
protection. The advantages of mini-enclosures are that they limit the spread of
asbestos contamination, reduce the potential exposure of bystanders and other
workers who may be working in adjacent areas, and are quick and easy to
install. The disadvantage of mini-enclosures is that they may be too small to
contain the equipment necessary to create a negative-pressure within the
enclosure; however, the double layer of plastic sheeting will serve to restrict
the release of asbestos fibers to the area outside the enclosure.
(ii) Work practices:
(A) Before use, the mini-enclosure must be
inspected for leaks and smoke-tested to detect breaches, and any breaches
sealed.
(B) Before reuse, the
interior must be completely washed with amended water and
HEPA-vacuumed.
(C) During use, air
movement must be directed away from the employee's breathing zone within the
mini-enclosure.
(8) Alternative control methods for Class I
work. Class I work may be performed using a control method which is not
referenced in subsections (2)(a) through (3)(e) of this section, or which
modifies a control method referenced in subsections (2)(a) through (3)(e) of
this section, if the following provisions are complied with:
(a) The control method must enclose, contain
or isolate the processes or source of airborne asbestos dust, before it enters
the breathing zone of employees.
(b)
A certified industrial hygienist or licensed professional
engineer who is also qualified as a project designer as defined in WAC
296-62-07703, must
evaluate the work area, the projected work practices and the engineering
controls and must certify in writing that the planned control method is
adequate to reduce direct and indirect employee exposure to below the PELs
under worst-case conditions of use, and that the planned control method will
prevent asbestos contamination outside the regulated area, as measured by
clearance sampling which meets the requirements of EPA's Asbestos in Schools
rule issued under AHERA, or perimeter monitoring which meets the criteria in
subsection (6)(b)(ii) of this section. Where the TSI or surfacing material to
be removed is twenty-five linear or ten square feet or less, the evaluation
required in subsection (8)(b) of this section may be performed by a competent
person.
(c) Before work which
involves the removal of more than twenty-five linear or ten square feet of
thermal system insulation or surfacing material is begun using an alternative
method which has been the subject of subsections (2)(a) through (3)(e) of this
section required evaluation and certification, the employer must include a copy
of such evaluation and certification with notifications required by WAC
296-65-020,
Notification requirements. The submission shall not constitute approval by
WISHA.
(d) The evaluation of
employee exposure required in WAC
296-62-07712(8) must include and be based on
sampling and analytical data representing employee exposure during the use of
such method under the worst-case conditions and by employees whose training and
experiences are equivalent to employees who are to perform the current
job.
(9) Work practices
and engineering controls for Class II work.
(a)
All Class II work must be supervised by a competent person as
defined in WAC
296-62-07703.
(b) For all indoor Class II jobs, where the
employer has not produced a negative exposure assessment according to WAC
296-62-07709(3),
or where during the job, changed conditions indicate there may be exposure
above the PEL or where the employer does not remove the ACM in a substantially
intact state, the employer must use one of the following methods to ensure that
airborne asbestos does not migrate from the regulated area:
(i) Critical barriers must be placed over
all openings to the regulated area; or
(ii)
The employer must use another barrier or isolation method which
prevents the migration of airborne asbestos from the regulated area, as
verified by perimeter area monitoring or clearance monitoring which meets the
criteria set out in subsection (6)(b)(ii) of this section.
(c) Impermeable dropcloths must be placed on
surfaces beneath all removal activity.
(d)
All Class II asbestos work must be performed using the work
practices and requirements set out above in subsection (2) of this
section.
(10)
Additional controls for Class II work. Class II asbestos work must also be
performed by complying with the work practices and controls designated for each
type of asbestos work to be performed, set out in this paragraph. Where more
than one control method may be used for a type of asbestos work, the employer
may choose one or a combination of designated control methods. Class II work
also may be performed using a method allowed for Class I work, except that
glove bags and glove boxes are allowed if they fully enclose the Class II
material to be removed.
(a) For removing
vinyl and asphalt flooring materials which contain ACM or for which in
buildings constructed no later than 1980, the employer has not verified the
absence of ACM according to WAC
296-62-07712(10)(a)(ix). The employer must
ensure that employees comply with the following work practices and that
employees are trained in these practices according to WAC
296-62-07722.
(i) Flooring or its backing must not be
sanded.
(ii) Vacuums equipped with
HEPA filter, disposable dust bag, and metal floor tool (no brush) must be used
to clean floors.
(iii) Resilient
sheeting must be removed by cutting with wetting of the snip point and wetting
during delamination. Rip-up of resilient sheet floor material is
prohibited.
(iv) All scraping of
residual adhesive and/or backing must be performed using wet methods.
(v) Dry sweeping is prohibited.
(vi) Mechanical chipping is prohibited
unless performed in a negative pressure enclosure which meets the requirements
of subsection (7)(a) of this section.
(vii)
Tiles must be removed intact, unless the employer demonstrates
that intact removal is not possible.
(viii)
When tiles are heated and can be removed intact, wetting may be
omitted.
(ix) Resilient flooring
material including associated mastic and backing must be assumed to be
asbestos-containing unless an industrial hygienist determines that it is
asbestos-free using recognized analytical techniques.
(b) For removing roofing material which
contains ACM the employer must ensure that the following work practices are
followed:
(i) Roofing material must be
removed in an intact state to the extent feasible.
(ii) Wet methods must be used to remove
roofing materials that are not intact, or that will be rendered not intact
during removal, unless such wet methods are not feasible or will create safety
hazards.
(iii) Cutting machines
must be continuously misted during use, unless a competent person determines
that misting substantially decreases worker safety.
(iv) When removing built-up roofs with
asbestos-containing roofing felts and an aggregate surface using a power roof
cutter, all dust resulting from the cutting operation must be collected by a
HEPA dust collector, or must be HEPA vacuumed by vacuuming along the cut line.
When removing built-up roofs with asbestos-containing roofing felts and a
smooth surface using a power roof cutter, the dust resulting from the cutting
operation must be collected either by a HEPA dust collector or HEPA vacuuming
along the cut line, or by gently sweeping and then carefully and completely
wiping up the still wet dust and debris left along the cut line. The dust and
debris must be immediately bagged or placed in covered containers.
(v) Asbestos-containing material that has
been removed from a roof must not be dropped or thrown to the ground. Unless
the material is carried or passed to the ground by hand, it must be lowered to
the ground via covered, dust-tight chute, crane or hoist:
(A) Any ACM that is not intact must be
lowered to the ground as soon as is practicable, but in any event no later than
the end of the work shift. While the material remains on the roof it must
either be kept wet, placed in an impermeable waste bag, or wrapped in plastic
sheeting.
(B) Intact ACM must be
lowered to the ground as soon as is practicable, but in any event no later than
the end of the work shift.
(vi)
Upon being lowered, unwrapped material must be transferred to a
closed receptacle in such manner so as to preclude the dispersion of
dust.
(vii) Roof level heating and
ventilation air intake sources must be isolated or the ventilation system must
be shut down.
(viii)
Notwithstanding any other provision of this section, removal or repair of
sections of intact roofing less than twenty-five square feet in area does not
require use of wet methods or HEPA vacuuming as long as manual methods which do
not render the material nonintact are used to remove the material and no
visible dust is created by the removal method used. In determining whether a
job involves less than twenty-five square feet, the employer must include all
removal and repair work performed on the same roof on the same day.
(c) When removing cementitious
asbestos-containing siding and shingles or transite panels containing ACM on
building exteriors (other than roofs, where subsection (10)(b) of this section
applies) the employer must ensure that the following work practices are
followed:
(i) Cutting, abrading or breaking
siding, shingles, or transite panels, must be prohibited unless the employer
can demonstrate that methods less likely to result in asbestos fiber release
cannot be used.
(ii) Each panel or
shingle must be sprayed with amended water prior to removal.
(iii) Unwrapped or unbagged panels or
shingles must be immediately lowered to the ground via covered dust-tight
chute, crane or hoist, or placed in an impervious waste bag or wrapped in
plastic sheeting and lowered to the ground no later than the end of the work
shift.
(iv) Nails must be cut with
flat, sharp instruments.
(d)
When removing gaskets containing ACM, the employer must ensure
that the following work practices are followed:
(i)
If a gasket is visibly deteriorated and unlikely to be removed
intact, removal must be undertaken within a glove bag as described in
subsection (7)(b) of this section.
(ii)
(Reserved.)
(iii)
The gasket must be immediately placed in a disposal container.
(iv) Any scraping to remove residue must be
performed wet.
(e) When
performing any other Class II removal of asbestos-containing material for which
specific controls have not been listed in subsection (10) of this section, the
employer must ensure that the following work practices are complied with.
(i) The material must be thoroughly wetted
with amended water prior to and during its removal.
(ii) The material must be removed in an
intact state unless the employer demonstrates that intact removal is not
possible.
(iii) Cutting, abrading
or breaking the material must be prohibited unless the employer can demonstrate
that methods less likely to result in asbestos fiber release are not
feasible.
(iv) Asbestos-containing
material removed, must be immediately bagged or wrapped, or kept wet until
transferred to a closed receptacle, no later than the end of the work
shift.
(f) Alternative
work practices and controls. Instead of the work practices and controls listed
in subsection (10) of this section, the employer may use different or modified
engineering and work practice controls if the following provisions are complied
with.
(i) The employer must demonstrate by
data representing employee exposure during the use of such method under
conditions which closely resemble the conditions under which the method is to
be used, that employee exposure will not exceed the PELs under any anticipated
circumstances.
(ii) A competent
person must evaluate the work area, the projected work practices and the
engineering controls, and must certify in writing, that the different or
modified controls are adequate to reduce direct and indirect employee exposure
to below the PELs under all expected conditions of use and that the method
meets the requirements of this standard. The evaluation must include and be
based on data representing employee exposure during the use of such method
under conditions which closely resemble the conditions under which the method
is to be used for the current job, and by employees whose training and
experience are equivalent to employees who are to perform the current
job.
(11)
Work practices and engineering controls for Class III asbestos work. Class III
asbestos work must be conducted using engineering and work practice controls
which minimize the exposure to employees performing the asbestos work and to
bystander employees.
(a) The work must be
performed using wet methods.
(b)
To the extent feasible, the work must be performed using local exhaust
ventilation.
(c) Where the
disturbance involves drilling, cutting, abrading, sanding, chipping, braking,
or sawing of thermal system insulation or surfacing material, the employer must
use impermeable dropcloths, and must isolate the operation using
mini-enclosures or glove bag systems according to subsection (7) of this
section or another isolation method.
(d)
Where the employer does not produce a "negative exposure
assessment" for a job, or where monitoring results show the PEL has been
exceeded, the employer must contain the area using impermeable dropcloths and
plastic barriers or their equivalent, or must isolate the operation using a
control system listed in and in compliance with subsection (7) of this
section.
(e) Employees performing
Class III jobs, which involve the disturbance of thermal system insulation or
surfacing material, or where the employer does not produce a "negative exposure
assessment" or where monitoring results show a PEL has been exceeded, must wear
respirators which are selected, used and fitted according to provisions of WAC
296-62-07715.
(12) Class IV asbestos work.
Class IV asbestos jobs must be conducted by employees trained according to the
asbestos awareness training program set out in WAC
296-62-07722.
In addition, all Class IV jobs must be conducted in conformity with the
requirements set out in this section, mandating wet methods, HEPA vacuums, and
prompt clean up of debris containing ACM and PACM.
(a)
Employees cleaning up debris and waste in a regulated area where
respirators are required must wear respirators which are selected, used and
fitted according to provisions of WAC
296-62-07715.
(b) Employers of employees who clean up
waste and debris in, and employers in control of, areas where friable thermal
system insulation or surfacing material is accessible, must assume that such
waste and debris contain asbestos.
(13) Alternative methods of compliance for
installation, removal, repair, and maintenance of certain roofing and pipeline
coating materials. Notwithstanding any other provision of this section, an
employer who complies with all provisions of subsection (10)(a) and (b) of this
section when installing, removing, repairing, or maintaining intact pipeline
asphaltic wrap, or roof flashings which contain asbestos fibers encapsulated or
coated by bituminous or resinous compounds will be deemed to be in compliance
with this section. If an employer does not comply with all provisions of this
subsection (13), or if during the course of the job the material does not
remain intact, the provisions of subsection (10) of this section apply instead
of this subsection (13).
(a) Before work
begins and as needed during the job, a competent person who is capable of
identifying asbestos hazards in the workplace and selecting the appropriate
control strategy for asbestos exposure, and who has the authority to take
prompt corrective measures to eliminate such hazards, must conduct an
inspection of the worksite and determine that the roofing material is intact
and will likely remain intact.
(b)
All employees performing work covered by this subsection (13) must be trained
in a training program that meets the requirements of WAC
296-62-07722.
(c) The material must not be sanded,
abraded, or ground. When manual methods are used, materials must stay
intact.
(d) Material that has been
removed from a roof must not be dropped or thrown to the ground. Unless the
material is carried or passed to the ground by hand, it must be lowered to the
ground via covered, dust-tight chute, crane or hoist. All such material must be
removed from the roof as soon as is practicable, but in any event no later than
the end of the work shift.
(e)
Where roofing products which have been labeled as containing asbestos pursuant
to WAC
296-62-07721,
installed on nonresidential roofs during operations covered by this subsection
(13), the employer must notify the building owner of the presence and location
of such materials no later than the end of the job.
(f) All removal or disturbance of pipeline
asphaltic wrap must be performed using wet methods.