Wash. Admin. Code § 296-863-200 - Design, construction, and equipment
Summary:
Your responsibility: To make sure PITs are properly designed, constructed, and equipped.
|
You must meet the requirements... |
in this section: |
|
Design and Construction |
|
|
Make sure PITs meet design and construction requirements |
WAC 296-863-20005 |
|
Meet these requirements when modifying or altering PITs |
WAC 296-863-20010 |
|
Labeling |
|
|
Make sure PITs are properly labeled |
WAC 296-863-20015 |
|
Equipment |
|
|
Protect operators from falling objects |
WAC 296-863-20020 |
|
Provide fall protection on order pickers |
WAC 296-863-20025 |
|
Provide directional lights on PITs when required |
WAC 296-863-20030 |
|
Liquefied Petroleum Gas (LPG) PITs |
|
|
Make sure liquefied petroleum gas (LPG) fueled PITs meet these requirements |
WAC 296-863-20035 |
|
Meet these requirements when converting gasoline fuel PITs to liquefied petroleum gas (LPG) fuel |
WAC 296-863-20040 |
Notes
Statutory Authority: RCW 49.17.010, 49.17.040, 49.17.050, 49.17.060. 04-19-051, § 296-863-200, filed 9/14/04, effective 2/1/05.
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.