W. Va. Code R. § 33-10-8 - Proposal Content
8.1. The
proposal for a recycling program assistance grant shall contain the following:
8.1.a. An outline of the materials to be
source separated and recycled. The list of recyclable material may be adjusted
according to whether the generator is residential, commercial or another type
of establishment;
8.1.b. A public
information program to ensure receipt of good clean quality
materials;
8.1.c. A description of
a collection system;
8.1.d. A
projection of the cost effectiveness and self-sufficiency of the proposed
project;
8.1.e. Documentation of
the type of in-kind services to be provided by the grantee ;
8.1.f. Documentation of any other type of
county, state and federal grant assistance, loans, or other financial support
received within the 36-month period prior to the grant submission deadline
date, including the dollar amount, type of project, purpose of funding, etc.,
for recycling and/or solid waste management;
8.1.g. Economic development aspects of the
project, i.e.: job creation;
8.1.h.
An analysis and projection of materials that are expected to be diverted from
the solid waste stream currently being landfilled and the cost and/or savings
that are expected to directly result from the proposed project;
8.1.i. A description of the proposed
project;
8.1.j. An estimated budget
with justification;
8.1.k. Attested
financial documents or complete federal tax returns for two years prior to the
year in which the proposal is submitted. Local governments that have not had an
audit or review in the year or fiscal year prior to the year in which the
proposal is submitted shall be allowed to submit the most current two years of
attested financial documents, provided that the most recent of those documents
are no older than 24 months prior to the submission deadline date. Businesses
or other entities that have been in existence less than two years shall submit
a detailed business plan to be approved by the department ;
8.1.l. A letter of receipt of proposal from
the county or regional solid waste authority in which the proposed project
shall be located, as required by section 9.2. of this rule;
8.1.m. A timeline graph representing the
objectives to be completed and the approximate dates of completion;
8.1.n. A checklist in which the applicant
indicates eligibility and completion of the proposal ;
8.1.o. A narrative profile demonstrating the
applicant 's past and current performance in recycling and operational
methods;
8.1.p. All equipment
specifications, provided by the seller and includes the seller's name and the
price of the equipment;
8.1.q.
Identify markets able to handle the projected volumes of material to be
collected;
8.1.r. The Drug Free
Workplace Act of 1988, Title V-D
Public Law
100-690, Federal Register, Volume 54, No. 19, and
West Virginia Code §
60A-2-201 requires that all state
governments, federal contractors, and federal and state grant recipients
maintain a drug-free workplace. The Act is implemented through additions to the
Debarment and Suspension regulations published in the Federal Register on
January 31, 1989. The certification form shall be completed and accompany the
grant proposal ; and
8.1.s.
Applicants requesting funding for a recycling coordinator/manager must include,
as part of the grant proposal , a list of objectives to be achieved during the
grant period and the methods of achieving those objectives.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.