W. Va. Code R. § 64-92-11 - Final Remediation Report
11.1. A final remediation report shall be
submitted to the commissioner within 10 business days of completion of
remediation of residential property as documented on the Plan Review, and
shall, at a minimum, contain the following:
11.1.1. The name, signature, copies of
licenses (for all technicians involved), copies of training certificates (for
all technicians involved) and license number of person who prepared the
report;
11.1.2. The physical
address of the property;
11.1.3. A
summary of any work performed which deviated from or was not discussed in the
approved preliminary remediation plan;
11.1.4. Documented use of waste-disposal
dumpsters at all remediation projects; the use of trailers, truck beds and/or
box trucks will be considered a violation of this rule;
11.1.5. Copies of waste manifests for all
materials removed from the property, including a complete list with serial
numbers (when applicable) of all items removed and disposed of from residential
property;
11.1.6. Copies of
clearance air monitoring sample results from a licensed asbestos clearance air
monitor if asbestos containing materials were disturbed;
11.1.7. Copies of asbestos certificates for
all asbestos contractors, workers, supervisors, and designers that performed
any asbestos remediation;
11.1.8.
Submission of final clearance analytical sample results by a third-party
licensed technician, including the following:
11.1.8.a. Approved laboratory sample results
with analysis for all samples collected, quality control plan for sampling of
site, description of analytical methods used, and laboratory quality assurance
and quality control plan;
11.1.8.b.
A legible site drawing showing the location of all samples taken;
11.1.8.c. A photograph of each sample
location cross-referenced to the laboratory results as identified on the site
drawing, including a description of exact sample location with written and
graphic description of sample locations;
11.1.9. A photograph of each room post
decontamination;
11.1.10. A
photograph of each item destroyed or rendered unusable on site;
11.1.11. Chain of custody forms with
signatures for all samples collected;
11.1.12. A copy of the final remediation
report checklist (available online at
https://www.wvdhhr.org/rtia/pdf/Final%20Remediation%20Report%20Checklist(1).pdf)
identifying the report page location for each required report component, along
with a signed statement that all remediation work was performed in accordance
with the provisions of this rule; and
11.1.13. Any other information requested by
the commissioner.
11.2.
If the submitted final remediation report is acceptable upon review, the
commissioner shall issue a certificate of remediation completion within 20
business days of receipt of the report.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.