Wis. Admin. Code Public Service Commission PSC 117.04 - Responsibilities of the public utility
In each rate proceeding before the
(1)
Information showing that the term of the contract does not extend more than 3
years, does not include an option for the purchaser to extend the term of the
contract to more than three years and does not include a provision which
automatically extends the term of the contract to more than 3 years.
(2) Information showing that excess capacity
to supply the sale existed at the time the sales contract was signed by the
selling utility and that available excess capacity was reasonably expected to
exist during the entire term of the contract.
(3) An analysis comparing the forecasted
revenues expected to be earned as a result of the sale with the forecasted
incremental costs to the public utility supplying the sale. This analysis shall
be presented for each annual period covered by the sale. The analysis must
include supporting calculation for both the forecasted revenues and the
forecasted incremental costs, and explanations of any underlying assumptions
made for the analysis.