Subchapter II - Additions to 49 CFR Part 192

  1. § PSC 135.053 - General additions [49 CFR 192.53]
  2. § PSC 135.055 - [Repealed]
  3. § PSC 135.125 - Design of copper pipe addition [49 CFR 192.125]
  4. § PSC 135.163 - Compressor stations: design and construction additions [49 CFR 192.163]
  5. § PSC 135.171 - Compressor stations: additional safety equipment addition [49 CFR 192.171]
  6. § PSC 135.173 - Compressor stations: ventilation addition [49 CFR 192.173]
  7. § PSC 135.181 - Distribution line valves addition [49 CFR 192.181]
  8. § PSC 135.183 - Vaults: structural design requirements additions [49 CFR 192.183]
  9. § PSC 135.187 - Vaults: sealing, venting, and ventilation addition [49 CFR 192.187]
  10. § PSC 135.189 - Vaults: drainage and waterproofing additions [49 CFR 192.189]
  11. § PSC 135.195 - Protection against accidental overpressuring additions [49 CFR 192.195]
  12. § PSC 135.197 - Control of the pressure of gas delivered from high-pressure distribution systems additions [49 CFR 192.197]
  13. § PSC 135.199 - Requirements for design of pressure relief and limiting devices additions [49 CFR 192.199]
  14. § PSC 135.204 - [Repealed]
  15. § PSC 135.206 - Addition [49 CFR 192.206w]
  16. § PSC 135.246 - Addition [49 CFR 192.246w]
  17. § PSC 135.279 - Copper pipe addition [49 CFR 192.279]
  18. § PSC 135.307 - Inspection of materials addition [49 CFR 192.307]
  19. § PSC 135.309 - Repair of steel pipe addition [49 CFR 192.309]
  20. § PSC 135.319 - Installation of pipe in a ditch additions [49 CFR 192.319]
  21. § PSC 135.321 - Installation of plastic pipe additions [49 CFR 192.321]
  22. § PSC 135.323 - Casing addition [49 CFR 192.323]
  23. § PSC 135.324 - Addition [49 CFR 192.324w]
  24. § PSC 135.325 - Underground clearance addition [49 CFR 192.325]
  25. § PSC 135.355 - Customer meters and regulators: protection from damage additions [49 CFR 192.355]
  26. § PSC 135.365 - Service lines: location of valves addition [49 CFR 192.365]
  27. § PSC 135.371 - Service lines: steel addition [49 CFR 192.371]
  28. § PSC 135.375 - Service lines: plastic addition [49 CFR 192.375]
  29. § PSC 135.377 - Service lines: copper additions [49 CFR 192.377]
  30. § PSC 135.457 - External corrosion control: buried or submerged pipelines installed before August 1, 1971 addition [49 CFR 192.457]
  31. § PSC 135.505 - Strength test requirements for steel pipeline to operate at a hoop stress of 30 percent or more of SMYS addition [49 CFR 192.505]
  32. § PSC 135.511 - Test requirements for service lines addition [49 CFR 192.511]
  33. § PSC 135.613 - Continuing surveillance additions [49 CFR 192.613]
  34. § PSC 135.614 - Damage prevention program addition. [49 CFR 192.614]
  35. § PSC 135.621 - Maximum allowable operating pressure: high-pressure distribution systems additions [49 CFR 192.621]
  36. § PSC 135.623 - Maximum allowable operating pressure: low-pressure distribution systems addition [49 CFR 192.623]
  37. § PSC 135.629 - Purging of pipelines addition [49 CFR 192.629]
  38. § PSC 135.707 - Line markers for mains and transmission lines addition [49 CFR 192.707]
  39. § PSC 135.713 - Transmission lines: permanent field repair of imperfections and damages addition [49 CFR 192.713]
  40. § PSC 135.714 - Addition [49 CFR 192.714w]
  41. § PSC 135.720 - [Repealed]
  42. § PSC 135.722 - Addition [49 CFR 192.722w]
  43. § PSC 135.723 - Distribution systems: leakage surveys additions [49 CFR 192.723]
  44. § PSC 135.724 - Addition [49 CFR 192.724w]
  45. § PSC 135.727 - Abandonment or deactivation of facilities addition [49 CFR 192.727]
  46. § PSC 135.735 - Compressor stations: storage of combustible materials addition [49 CFR 192.735]
  47. § PSC 135.741 - Pressure limiting and regulating stations: telemetering or recording gauges addition [49 CFR 192.741]
  48. § PSC 135.744 - Addition [49 CFR 192.744w]
  49. § PSC 135.747 - Valve maintenance: distribution systems addition [49 CFR 192.747]
  50. § PSC 135.751 - Prevention of accidental ignition addition [49 CFR 192.751]
  51. § PSC 135.753 - [Repealed]

The following state regulations pages link to this page.



State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.