053-7 Wyo. Code R. § 7-4 - Cementing
(a) Specific requirements.
(i) A pressure test on pump discharge lines
when squeeze cementing shall be made at 1,000 psi over the maximum pressure
specified by customer for his well equipment.
(ii) All valves in discharge lines shall be
checked to see that they are open before giving orders to pump.
(iii) During operations each employee
designated to handle the pumping shall remain constantly at his designated
position while the pump is in operation, unless relieved by an authorized
employee as directed by the supervisor on that job.
(iv) Unauthorized persons shall remain at
least 75 feet from all pumping operations and pressure testing
operations.
(v) Cementing pressure
shall not exceed the equipment's maximum safe working pressure.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.