053-7 Wyo. Code R. § 7-4 - Cementing

(a) Specific requirements.
(i) A pressure test on pump discharge lines when squeeze cementing shall be made at 1,000 psi over the maximum pressure specified by customer for his well equipment.
(ii) All valves in discharge lines shall be checked to see that they are open before giving orders to pump.
(iii) During operations each employee designated to handle the pumping shall remain constantly at his designated position while the pump is in operation, unless relieved by an authorized employee as directed by the supervisor on that job.
(iv) Unauthorized persons shall remain at least 75 feet from all pumping operations and pressure testing operations.
(v) Cementing pressure shall not exceed the equipment's maximum safe working pressure.

Notes

053-7 Wyo. Code R. § 7-4

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.