30 CFR 77.216-1 - Water, sediment or slurry impoundments and impounding structures; identification.

§ 77.216-1 Water, sediment or slurry impoundments and impounding structures; identification.
A permanent identification marker, at least six feet high and showing the identification number of the impounding structure as assigned by the District Manager, the name associated with the impounding structure and name of the person owning, operating, or controlling the structure, shall be located on or immediately adjacent to each water, sediment or slurry impounding structure within the time specified in paragraph (a) or (b) of this section as applicable.
(a) For existing water, sediment or slurry impounding structures, markers shall be placed before May 1, 1976.
(b) For new or proposed water, sediment, or slurry impounding structures, markers shall be placed within 30 days from the start of construction.
(Secs. 101, 508, Pub. L. 91-173, 83 Stat. 745, 803 (30 U.S.C. 811, 957))
[40 FR 41777, Sept. 9, 1975]

Title 30 published on 2013-07-01

no entries appear in the Federal Register after this date.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code