30 CFR Subpart D - Subpart D—Ventilation
- § 75.300 Scope.
- § 75.301 Definitions.
- § 75.302 Main mine fans.
- § 75.310 Installation of main mine fans.
- § 75.311 Main mine fan operation.
- § 75.312 Main mine fan examinations and records.
- § 75.313 Main mine fan stoppage with persons underground.
- § 75.320 Air quality detectors and measurement devices.
- § 75.321 Air quality.
- § 75.322 Harmful quantities of noxious gases.
- § 75.323 Actions for excessive methane.
- § 75.324 Intentional changes in the ventilation system.
- § 75.325 Air quantity.
- § 75.326 Mean entry air velocity.
- § 75.327 Air courses and trolley haulage systems.
- § 75.330 Face ventilation control devices.
- § 75.331 Auxiliary fans and tubing.
- § 75.332 Working sections and working places.
- § 75.333 Ventilation controls.
- § 75.334 Worked-out areas and areas where pillars are being recovered.
- § 75.335 Seal strengths, design applications, and installation.
- § 75.336 Sampling and monitoring requirements.
- § 75.337 Construction and repair of seals.
- § 75.338 Training.
- § 75.339 Seals records.
- § 75.340 Underground electrical installations.
- § 75.341 Direct-fired intake air heaters.
- § 75.342 Methane monitors.
- § 75.343 Underground shops.
- § 75.344 Compressors.
- § 75.350 Belt air course ventilation.
- § 75.351 Atmospheric monitoring systems.
- § 75.352 Actions in response to AMS malfunction, alert, or alarm signals.
- § 75.360 Preshift examination at fixed intervals.
- § 75.361 Supplemental examination.
- § 75.362 On-shift examination.
- § 75.363 Hazardous conditions and violations of mandatory health or safety standards; posting, correcting, and recording.
- § 75.364 Weekly examination.
- § 75.370 Mine ventilation plan; submission and approval.
- § 75.371 Mine ventilation plan; contents.
- § 75.372 Mine ventilation map.
- § 75.373 Reopening mines.
- § 75.380 Escapeways; bituminous and lignite mines.
- § 75.381 Escapeways; anthracite mines.
- § 75.382 Mechanical escape facilities.
- § 75.384 Longwall and shortwall travelways.
- § 75.385 Opening new mines.
- § 75.386 Final mining of pillars.
- § 75.388 Boreholes in advance of mining.
- § 75.389 Mining into inaccessible areas.
Source:
61 FR 9829, Mar. 11, 1996, unless otherwise noted.