Table 7 to Subpart GGG of Part 63—Wastewater—Inspection and Monitoring Requirements for Waste Management Units
To comply with Inspection or monitoring requirement Frequency of inspection or monitoring Method
a As specified in § 63.1256(e), the owner or operator shall comply with either the requirements of § 63.1256(e)(1) and (2) or § 63.1256(e)(4) and (5).
b Within 60 days of installation as specified in § 63.1256(f)(3).
TANKS:
63.1256(b)(3)(i) Inspect fixed roof and all openings for leaks Initially Semiannually Visual.
63.1256(b)(4) Inspect floating roof in accordance with §§ 63.120(a)(2) and (a)(3) See §§ 63.120(a)(2) and (a)(3) Visual.
63.1256(b)(5) Measure floating roof seal gaps in accordance with §§ 63.120(b)(2)(i) through (b)(4) See § 63.120(b)(2)(i) through (b)(4).
—Primary seal gaps Initially Once every 5 years (annually if no secondary seal).
—Secondary seal gaps Initially Semiannually
63.1256(b)(7)63.1256(b)(8) Inspect wastewater tank for control equipment failures and improper work practices Initially Semiannually Visual.
SURFACE IMPOUNDMENTS:
63.1256(c)(1)(i) Inspect cover and all openings for leaks Initially Semiannually Visual.
63.1256(c)(2) Inspect surface impoundment for control equipment failures and improper work practices Initially Semiannually Visual.
CONTAINERS:
63.1256(d)(1)(i)63.1256(d)(1)(ii) Inspect cover and all openings for leaks Initially Semiannually Visual.
63.1256(d)(3)(i) Inspect enclosure and all openings for leaks Initially Semiannually Visual.
63.1256(d)(4) Inspect container for control equipment failures and improper work practices Initially Semiannually Visual.
INDIVIDUAL DRAIN SYSTEMS a:
63.1256(e)(1)(i) Inspect cover and all openings to ensure there are no gaps, cracks, or holes Initially Semiannually Visual.
63.1256(e)(2) Inspect individual drain system for control equipment failures and improper work practices Initially Semiannually Visual.
63.1256(e)(4)(i) Verify that sufficient water is present to properly maintain integrity of water seals Initially Semiannually Visual.
63.1256(e)(4)(ii)63.1256(e)(5)(i) Inspect all drains using tightly-fitted caps or plugs to ensure caps and plugs are in place and properly installed Initially Semiannually Visual.
63.1256(e)(5)(ii) Inspect all junction boxes to ensure covers are in place and have no visible gaps, cracks, or holes Initially Semiannually Visual or smoke test or other means as specified.
63.1256(e)(5)(iii) Inspect unburied portion of all sewer lines for cracks and gaps Initially Semiannually Visual.
OIL-WATER SEPARATORS:
63.1256(f)(2)(i) Inspect fixed roof and all openings for leaks Initially Semiannually Visual.
63.1256(f)(3) Measure floating roof seal gaps in accordance with 40 CFR 60.696(d)(1) Initially b See 40 CFR 60.696(d)(1).
—Primary seal gaps Once every 5 years.
63.1256(f)(3) —Secondary seal gaps Initially b Annually.
63.1256(f)(4) Inspect oil-water separator for control equipment failures and improper work practices Initially Semiannually Visual.

Title 40 published on 2013-07-01

The following are only the Rules published in the Federal Register after the published date of Title 40.

For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.

  • 2014-03-27; vol. 79 # 59 - Thursday, March 27, 2014
    1. 79 FR 17340 - National Emission Standards for Hazardous Air Pollutant Emissions: Group IV Polymers and Resins; Pesticide Active Ingredient Production; and Polyether Polyols Production
      GPO FDSys XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Final rule.
      This final action is effective on March 27, 2014. The incorporation by reference of certain publications listed in this final rule was approved by the Director of the Federal Register as of March 27, 2014.
      40 CFR Part 63

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 40 published on 2013-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 40 CFR 63 after this date.

  • 2014-07-02; vol. 79 # 127 - Wednesday, July 2, 2014
    1. 79 FR 37850 - National Emission Standards for Hazardous Air Pollutants: Off-Site Waste and Recovery Operations
      GPO FDSys XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Proposed rule.
      Comments. Comments must be received on or before August 18, 2014. A copy of comments on the information collection provisions should be submitted to the Office of Management and Budget (OMB) on or before August 1, 2014. Public Hearing. We do not plan to conduct a public hearing unless requested. If requested, we will hold a public hearing on July 17, 2014. To request a hearing, please contact the person listed in the following FOR FURTHER INFORMATION CONTACT section by July 14, 2014.
      40 CFR Part 63