49 CFR 173.175 - Permeation devices.

Status message

There are 10 Updates appearing in the Federal Register for 49 CFR 173. View below or at eCFR (GPOAccess)
§ 173.175 Permeation devices.
Permeation devices that contain hazardous materials and that are used for calibrating air quality monitoring devices are not subject to the requirements of this subchapter provided the following requirements are met:
(a) Each device must be constructed of a material compatible with the hazardous materials it contains;
(b) The total contents of hazardous materials in each device is limited to 2 ml (0.07 ounces) and the device must not be liquid full at 55 °C (131 °F);
(c) Each permeation device must be placed in a sealed, high impact resistant, tubular inner packaging of plastic or equivalent material. Sufficient absorbent material must be contained in the inner packaging to completely absorb the contents of the device. The closure of the inner packaging must be securely held in place with wire, tape or other positive means;
(d) Each inner packaging must be contained in a secondary packaging constructed of metal, or plastic having a minimum thickness of 1.5 mm (0.06 inches). The secondary packaging must be hermetically sealed;
(e) The secondary packaging must be securely packed in strong outer packaging. The completed package must be capable of withstanding, without breakage or leakage of any inner packaging and without significant reduction in effectiveness:
(1) The following free drops onto a rigid, non resilient, flat and horizontal surface from a height of 1.8 m (5.9 feet):
(i) One drop flat on the bottom;
(ii) One drop flat on the top;
(iii) One drop flat on the long side;
(iv) One drop flat on the short side;
(v) One drop on a corner at the junction of three intersecting edges; and
(2) A force applied to the top surface for a duration of 24 hours, equivalent to the total weight of identical packages if stacked to a height of 3 m (10 feet) (including the test sample).
(3) Each of the above tests may be performed on different but identical packages.
(f) The gross mass of the completed package must not exceed 30 kg.
[76 FR 43530, July 20, 2011]

Title 49 published on 2013-10-01

The following are only the Rules published in the Federal Register after the published date of Title 49.

For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.

  • 2014-09-24; vol. 79 # 185 - Wednesday, September 24, 2014
    1. 79 FR 56988 - Clarification on Fireworks Policy Regarding Display Aerial Shells With Attachments
      GPO FDSys XML | Text
      DEPARTMENT OF TRANSPORTATION, Pipeline and Hazardous Materials Safety Administration
      Clarification.
      September 24, 2014.
      49 CFR Part 173

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 49 published on 2013-10-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 49 CFR 173 after this date.

  • 2014-09-25; vol. 79 # 186 - Thursday, September 25, 2014
    1. 79 FR 57494 - Hazardous Materials: Reverse Logistics (RRR).
      GPO FDSys XML | Text
      DEPARTMENT OF TRANSPORTATION, Pipeline and Hazardous Materials Safety Administration
      Notice of proposed rulemaking. Extension of comment period.
      The comment period for the NPRM published August 11, 2014, at 79 FR 46748, is extended from October 10, 2014, until November 10, 2014. To the extent possible, PHMSA will consider late-filed comments.
      49 CFR Parts 171 and 173