42 USC § 8322 - Permanent exemptions
(a)
Permanent exemption due to lack of alternate fuel supply, site limitations, environmental requirements, or adequate capital
(1)
After consideration of a petition (and comments thereon) for an exemption for a powerplant from the prohibitions of part A, the Secretary shall, by order, grant a permanent exemption under this subsection with respect to natural gas or petroleum, if he finds that the petitioner has demonstrated that despite diligent good faith efforts—
(A)
it is likely that an adequate and reliable supply of coal or other alternate fuel of the quality necessary to conform with design and operational requirements for use as a primary energy source
(ii)
will not be available at a cost (taking into account associated facilities for the transportation and use of such fuel) which, based upon the best practicable estimates, does not substantially exceed the cost, as determined by rule by the Secretary, of the fuel that would be used as a primary energy source during the useful life of the powerplant involved;
(B)
one or more site limitations exist which would not permit the location or operation of such powerplant using coal or any other alternate fuel as a primary energy source;
(b)
Permanent exemption due to certain State or local requirements
After consideration of a petition (and comments thereon) for an exemption for a powerplant from the prohibitions of part A, the Secretary may, by order, grant a permanent exemption under this subsection with respect to natural gas or petroleum, if he finds that the petitioner has demonstrated that—
(1)
with respect to the proposed site of the powerplant, the construction or operation of such a facility using coal or any other alternate fuel is infeasible because of a State or local requirement (other than a building code or a nuisance or zoning law);
(c)
Permanent exemption for cogeneration
After consideration of a petition (and comments thereon) for an exemption from one or more of the prohibitions of part A for a cogeneration facility, the Secretary may, by order, grant a permanent exemption under this subsection with respect to natural gas or petroleum, if he—
(d)
Permanent exemption for certain mixtures containing natural gas or petroleum
After consideration of a petition (and comments thereon) for an exemption for a powerplant from the prohibitions of part A, the Secretary shall, by order, grant a permanent exemption under this subsection with respect to natural gas or petroleum, if he finds that the petitioner has demonstrated that—
(1)
the powerplant uses, or proposes to use, a mixture of petroleum or natural gas and coal or another alternate fuel as a primary energy source; and
(2)
the amount of the petroleum or natural gas used in such mixture will not exceed the minimum percentage of the total Btu heat input of the primary energy sources of such powerplant needed to maintain reliability of operation of such powerplant consistent with maintaining a reasonable level of fuel efficiency, as determined in accordance with rules prescribed by the Secretary.
(e)
Permanent exemption for emergency purposes
After consideration of a petition (and comments thereon) for an exemption from one or more of the prohibitions of part A for a powerplant, the Secretary shall, by order, grant a permanent exemption under this subsection with respect to natural gas or petroleum, if he finds that the petitioner has demonstrated that such powerplant will be maintained and operated only for emergency purposes (as defined by rule by the Secretary).
(f)
Permanent exemption for powerplants necessary to maintain reliability of service
After consideration of a petition (and comments thereon) for an exemption for a powerplant from one or more of the prohibitions of part A, the Secretary may, by order, grant a permanent exemption under this subsection with respect to natural gas or petroleum if he finds that the petitioner has demonstrated that—
(a)
Permanent exemption due to lack of alternate fuel supply, site limitations, environmental requirements, or adequate capital
(1)
After consideration of a petition (and comments thereon) for an exemption for a powerplant from the prohibitions of part A, the Secretary shall, by order, grant a permanent exemption under this subsection with respect to natural gas or petroleum, if he finds that the petitioner has demonstrated that despite diligent good faith efforts—
(A)
it is likely that an adequate and reliable supply of coal or other alternate fuel of the quality necessary to conform with design and operational requirements for use as a primary energy source
(ii)
will not be available at a cost (taking into account associated facilities for the transportation and use of such fuel) which, based upon the best practicable estimates, does not substantially exceed the cost, as determined by rule by the Secretary, of the fuel that would be used as a primary energy source during the useful life of the powerplant involved;
(B)
one or more site limitations exist which would not permit the location or operation of such powerplant using coal or any other alternate fuel as a primary energy source;
(b)
Permanent exemption due to certain State or local requirements
After consideration of a petition (and comments thereon) for an exemption for a powerplant from the prohibitions of part A, the Secretary may, by order, grant a permanent exemption under this subsection with respect to natural gas or petroleum, if he finds that the petitioner has demonstrated that—
(1)
with respect to the proposed site of the powerplant, the construction or operation of such a facility using coal or any other alternate fuel is infeasible because of a State or local requirement (other than a building code or a nuisance or zoning law);
(c)
Permanent exemption for cogeneration
After consideration of a petition (and comments thereon) for an exemption from one or more of the prohibitions of part A for a cogeneration facility, the Secretary may, by order, grant a permanent exemption under this subsection with respect to natural gas or petroleum, if he—
(d)
Permanent exemption for certain mixtures containing natural gas or petroleum
After consideration of a petition (and comments thereon) for an exemption for a powerplant from the prohibitions of part A, the Secretary shall, by order, grant a permanent exemption under this subsection with respect to natural gas or petroleum, if he finds that the petitioner has demonstrated that—
(1)
the powerplant uses, or proposes to use, a mixture of petroleum or natural gas and coal or another alternate fuel as a primary energy source; and
(2)
the amount of the petroleum or natural gas used in such mixture will not exceed the minimum percentage of the total Btu heat input of the primary energy sources of such powerplant needed to maintain reliability of operation of such powerplant consistent with maintaining a reasonable level of fuel efficiency, as determined in accordance with rules prescribed by the Secretary.
(e)
Permanent exemption for emergency purposes
After consideration of a petition (and comments thereon) for an exemption from one or more of the prohibitions of part A for a powerplant, the Secretary shall, by order, grant a permanent exemption under this subsection with respect to natural gas or petroleum, if he finds that the petitioner has demonstrated that such powerplant will be maintained and operated only for emergency purposes (as defined by rule by the Secretary).
(f)
Permanent exemption for powerplants necessary to maintain reliability of service
After consideration of a petition (and comments thereon) for an exemption for a powerplant from one or more of the prohibitions of part A, the Secretary may, by order, grant a permanent exemption under this subsection with respect to natural gas or petroleum if he finds that the petitioner has demonstrated that—
Source
(Pub. L. 95–620, title II, § 212,Nov. 9, 1978, 92 Stat. 3300; Pub. L. 100–42, § 1(c)(6),May 21, 1987, 101 Stat. 312.)
References in Text
This chapter, referred to in subsec. (b)(3), was in the original “this Act”, meaning Pub. L. 95–620, Nov. 9, 1978, 92 Stat. 3289, known as the Powerplant and Industrial Fuel Use Act of 1978, which is classified principally to this chapter. For complete classification of this Act to the Code, see Short Title note set out under section
8301 of this title and Tables.
Amendments
1987—Subsec. (a)(1). Pub. L. 100–42, § 1(c)(6)(A)–(C), substituted “from” for “or installation from one or more of” in introductory provisions, substituted “the fuel that would be used” for “using imported petroleum” and struck out “or installation” after “powerplant” wherever appearing in subpar. (A), and struck out “or installation” after “powerplant” in subpars. (B) and (D).
Subsec. (a)(2). Pub. L. 100–42, § 1(c)(1)(D), struck out “—
“(A) in the case of a new major fuel-burning installation, be made with respect to the site of such installation proposed by the petitioner; and
“(B) in the case of a new electric powerplant,”
after “paragraph (1) shall”.
Subsec. (a)(3). Pub. L. 100–42, § 1(c)(6)(E), struck out par. (3) which read as follows: “Notwithstanding the preceding provisions of this subsection, a powerplant which has been granted an exemption under subsection (h) of this section may not be granted an exemption under this subsection.”
Subsec. (b). Pub. L. 100–42, § 1(c)(6)(A), (B), (F), in introductory provisions substituted “from” for “or installation from one or more of”, in par. (1) struck out “or installation” after “powerplant”, and in par. (2) struck out “in the case of a powerplant,” after “(2)”.
Subsec. (d). Pub. L. 100–42, § 1(c)(6)(A), (B), (G), struck out “(1)” before “After consideration of”, substituted “from” for “installation from one or more of” in introductory provisions, redesignated subpars. (A) and (B) of former par. (1) as pars. (1) and (2), respectively, struck out “or installation” after “powerplant” wherever appearing in such pars., and struck out former par. (2) which read as follows: “In the case of a new major fuel-burning installation, the percentage determined by the Secretary under subparagraph (B) of paragraph (1) shall not be less than 25 percent.”
Subsec. (e). Pub. L. 100–42, § 1(c)(6)(B), struck out “or installation” after “powerplant” wherever appearing.
Subsec. (g). Pub. L. 100–42, § 1(c)(6)(H), struck out subsec. (g) which related to issuance, by order of Secretary of Energy, of permanent exemptions for use of natural gas or petroleum for peakload powerplants.
Subsec. (h). Pub. L. 100–42, § 1(c)(6)(H), struck out subsec. (h) which related to issuance, by order of Secretary of Energy, of permanent exemptions for use of petroleum for intermediate load powerplants.
Subsec. (i). Pub. L. 100–42, § 1(c)(6)(H), struck out subsec. (i) which related to issuance, by order of Secretary of Energy, of permanent exemptions for use of natural gas or petroleum for installations based upon product or process requirements.
Subsec. (j). Pub. L. 100–42, § 1(c)(6)(H), struck out subsec. (j) which related to issuance, by order of Secretary of Energy, of permanent exemptions for use of natural gas or petroleum for installations necessary to meet scheduled equipment outages.
Exemption for Certain Electric Powerplants as Effective Prior to 180 Days After November 9, 1978
For effectiveness of exemption for certain electric powerplants as prior to 180 days after Nov. 9, 1978, see section 902(a) ofPub. L. 95–620, set out as a note under section
8301 of this title.
The table below lists the classification updates, since Jan. 3, 2012, for this section. Updates to a broader range of sections may be found at the update page for containing chapter, title, etc.
The most recent Classification Table update that we have noticed was Friday, May 3, 2013
An empty table indicates that we see no relevant changes listed in the classification tables. If you suspect that our system may be missing something, please double-check with the Office of the Law Revision Counsel.
| 42 USC | Description of Change | Session Year | Public Law | Statutes at Large |
|---|
LII has no control over and does not endorse any external Internet site that contains links to or references LII.