30 CFR Subpart P - Subpart P—Sulphur Operations
- § 250.1600 Performance standard.
- § 250.1601 Definitions.
- § 250.1602 Applicability.
- § 250.1603 Determination of sulphur deposit.
- § 250.1604 General requirements.
- § 250.1605 Drilling requirements.
- § 250.1606 Control of wells.
- § 250.1607 Field rules.
- § 250.1608 Well casing and cementing.
- § 250.1609 Pressure testing of casing.
- § 250.1610 Blowout preventer systems and system components.
- § 250.1611 Blowout preventer systems tests, actuations, inspections, and maintenance.
- § 250.1612 Well-control drills.
- § 250.1613 Diverter systems.
- § 250.1614 Mud program.
- § 250.1615 Securing of wells.
- § 250.1616 Supervision, surveillance, and training.
- § 250.1617 Application for permit to drill.
- § 250.1618 Application for permit to modify.
- § 250.1619 Well records.
- § 250.1620 Well-completion and well-workover requirements.
- § 250.1621 Crew instructions.
- § 250.1622 Approvals and reporting of well-completion and well-workover operations.
- § 250.1623 Well-control fluids, equipment, and operations.
- § 250.1624 Blowout prevention equipment.
- § 250.1625 Blowout preventer system testing, records, and drills.
- § 250.1626 Tubing and wellhead equipment.
- § 250.1627 Production requirements.
- § 250.1628 Design, installation, and operation of production systems.
- § 250.1629 Additional production and fuel gas system requirements.
- § 250.1630 Safety-system testing and records.
- § 250.1631 Safety device training.
- § 250.1632 Production rates.
- § 250.1633 Production measurement.
- § 250.1634 Site security.