33 CFR 155.4030 - Required salvage and marine firefighting services to list in response plans.

Status message

There are 3 Updates appearing in the Federal Register for 33 CFR 155. View below or at eCFR (GPOAccess)
§ 155.4030 Required salvage and marine firefighting services to list in response plans.
(a) You must identify, in the geographical-specific appendices of your VRP, the salvage and marine firefighting services listed in Table 155.4030(b)—Salvage and Marine Firefighting Services and Response Timeframes. Additionally, you must list those resource providers that you have contracted to provide these services. You may list multiple resource providers for each service, but you must identify which one is your primary resource provider for each Captain of the Port (COTP) zone in which you operate. A method of contact, consistent with the requirements in §§ 155.1035(e)(6)(ii) and 155.1040(e)(5)(ii), must also be listed, in the geographical-specific appendices of your VRP, adjacent to the name of the resource provider.
(b) Table 155.4030(b) lists the required salvage and marine firefighting services and response timeframes.
Table 155.4030(b)—Salvage and Marine Firefighting Services and Response Timeframes
1 Heavy lift services are not required to have definite hours for a response time. The planholder must still contract for heavy lift services, provide a description of the heavy lift response and an estimated response time when these services are required, however, none of the timeframes listed in the table in § 155.4030(b) will apply to these services.
Service Location of incident response activity timeframe
(1) Salvage CONUS: nearshore area; inland waters; Great Lakes; and OCONUS: < or = 12 miles from COTP city (hours) CONUS: offshore area; and OCONUS: < or = 50 miles from COTP city (hours)
(i) Assessment & Survey:
(A) Remote assessment and consultation 1 1
(B) Begin assessment of structural stability 3 3
(C) On-site salvage assessment 6 12
(D) Assessment of structural stability 12 18
(E) Hull and bottom survey 12 18
(ii) Stabilization:
(A) Emergency towing 12 18
(B) Salvage plan 16 22
(C) External emergency transfer operations 18 24
(D) Emergency lightering 18 24
(E) Other refloating methods 18 24
(F) Making temporary repairs 18 24
(G) Diving services support 18 24
(iii) Specialized Salvage Operations:
(A) Special salvage operations plan 18 24
(B) Subsurface product removal 72 84
(C) Heavy lift 1 Estimated Estimated
(2) Marine firefighting At pier (hours) CONUS: Nearshore area; inland waters; Great Lakes; and OCONUS: < or = 12 miles from COTP city (hours) CONUS: Offshore area; and OCONUS: < or = 50 miles from COTP city (hours)
(i) Assessment & Planning:
(A) Remote assessment and consultation 1 1 1
(B) On-site fire assessment 2 6 12
(ii) Fire Suppression:
(A) External firefighting teams 4 8 12
(B) External vessel firefighting systems 4 12 18
(c) Integration into the response organization. You must ensure that all salvage and marine firefighting resource providers are integrated into the response organizations listed in your plans. The response organization must be consistent with the requirements set forth in §§ 155.1035(d), 155.1040(d) and 155.1045(d).
(d) Coordination with other response resource providers, response organizations and OSROs. Your plan must include provisions on how the salvage and marine firefighting resource providers will coordinate with other response resources, response organizations, and OSROs. For example, you will need to identify how salvage and marine firefighting assessment personnel will coordinate response activity with oil spill removal organizations. For services that, by law, require public assistance, there must be clear guidelines on how service providers will interact with those organizations. The information contained in the response plan must be consistent with applicable Area Contingency Plans (ACPs) and the National Oil and Hazardous Substances Pollution Contingency Plan as found in § 155.1030(h).
(e) Ensuring the proper emergency towing vessels are listed in your VRP. Your VRP must identify towing vessels with the proper characteristics, horsepower, and bollard pull to tow your vessel(s). These towing vessels must be capable of operating in environments where the winds are up to 40 knots.
(f) Ensuring the proper type and amount of transfer equipment is listed in your VRP. Your salvage resource provider must be able to bring on scene a pumping capability that can offload the vessel's largest cargo tank in 24 hours of continuous operation. This is required for both emergency transfer and lightering operations.
(g) Ensuring firefighting equipment is compatible with your vessel. Your plan must list the proper type and amount of extinguishing agent needed to combat a fire involving your vessel's cargo, other contents, and superstructure. If your primary extinguishing agent is foam or water, you must identify resources in your plan that are able to pump, for a minimum of 20 minutes, at least 0.016 gallons per minute per square foot of the deck area of your vessel, or an appropriate rate for spaces that this rate is not suitable for and if needed, an adequate source of foam. These resources described are to be supplied by the resource provider, external to the vessel's own firefighting system.
(h) Ensuring the proper subsurface product removal. You must have subsurface product removal capability if your vessel(s) operates in waters of 40 feet or more. Your resource provider must have the capability of removing cargo and fuel from your sunken vessel to a depth equal to the maximum your vessel operates in up to 150 feet.
[USCG-1998-3417, 73 FR 80649, Dec. 31, 2008; 74 FR 7648, Feb. 19, 2009; USCG-2010-0351, 75 FR 36285, June 25, 2010]

Title 33 published on 2013-07-01

The following are only the Rules published in the Federal Register after the published date of Title 33.

For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.

  • 2013-11-08; vol. 78 # 217 - Friday, November 8, 2013
    1. 78 FR 67027 - Nontank Vessel Response Plans and Other Response Plan Requirements
      GPO FDSys XML | Text
      DEPARTMENT OF HOMELAND SECURITY, Coast Guard
      Rule; information collection approval.
      The collection of information requirement under 33 CFR 155.5023, 155.5025, and 155.5055 through 155.5075 can be enforced beginning November 8, 2013.
      33 CFR Part 151, 155 and 160

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
Public Laws
Presidential Documents

Executive Order ... 11735

Executive Order ... 12777

Title 33 published on 2013-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 33 CFR 155 after this date.

  • 2013-11-08; vol. 78 # 217 - Friday, November 8, 2013
    1. 78 FR 67027 - Nontank Vessel Response Plans and Other Response Plan Requirements
      GPO FDSys XML | Text
      DEPARTMENT OF HOMELAND SECURITY, Coast Guard
      Rule; information collection approval.
      The collection of information requirement under 33 CFR 155.5023, 155.5025, and 155.5055 through 155.5075 can be enforced beginning November 8, 2013.
      33 CFR Part 151, 155 and 160