The Board may study, plan, design, engineer, and construct a photovoltaic system for the main roof of the John F. Kennedy Center for the Performing Arts.
(b) Report
Not later than 60 days before beginning construction of the photovoltaic system pursuant to subsection (a), the Board shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report on the feasibility and design of the project.
The Board may study, plan, design, engineer, and construct a photovoltaic system for the main roof of the John F. Kennedy Center for the Performing Arts.
(b) Report
Not later than 60 days before beginning construction of the photovoltaic system pursuant to subsection (a), the Board shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report on the feasibility and design of the project.
The table below lists the classification updates, since Jan. 3, 2012, for this section. Updates to a broader range of sections may be found at the update page for containing chapter, title, etc.
The most recent Classification Table update that we have noticed was Friday, May 3, 2013
An empty table indicates that we see no relevant changes listed in the classification tables. If you suspect that our system may be missing something, please double-check with the Office of the Law Revision Counsel.
20 USC
Description of Change
Session Year
Public Law
Statutes at Large
This is a list of parts within the Code of Federal Regulations for which this US Code section provides rulemaking authority.
It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.
LII has no control over and does not endorse any external Internet site that contains links to or references LII.