14 CFR 25.301 - Loads.

prev | next
§ 25.301 Loads.

(a) Strength requirements are specified in terms of limit loads (the maximum loads to be expected in service) and ultimate loads (limit loads multiplied by prescribed factors of safety). Unless otherwise provided, prescribed loads are limit loads.

(b) Unless otherwise provided, the specified air, ground, and water loads must be placed in equilibrium with inertia forces, considering each item of mass in the airplane. These loads must be distributed to conservatively approximate or closely represent actual conditions. Methods used to determine load intensities and distribution must be validated by flight load measurement unless the methods used for determining those loading conditions are shown to be reliable.

(c) If deflections under load would significantly change the distribution of external or internal loads, this redistribution must be taken into account.

[Doc. No. 5066, 29 FR 18291, Dec. 24, 1964, as amended by Amdt. 25-23, 35 FR 5672, Apr. 8, 1970]

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 14 published on 03-May-2017 03:58

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 14 CFR Part 25 after this date.

  • 2017-05-16; vol. 82 # 93 - Tuesday, May 16, 2017
    1. 82 FR - Special Conditions: Dassault Aviation Model Falcon 900EX Airplane; Electronic System-Security Protection From Unauthorized External Access
      GPO FDSys XML | Text
      DEPARTMENT OF TRANSPORTATION, Federal Aviation Administration
      Final special conditions, request for comment; withdrawal.
      This withdrawal of special conditions is effective on Dassault on April 7, 2017.
      14 CFR Part 25

Pages

The section you are viewing is cited by the following CFR sections.