§ 806.30 Monitoring.

The Commission, as part of the project review, shall evaluate the proposed methodology for monitoring consumptive uses, water withdrawals and mitigating flows, including flow metering devices, stream gages, and other facilities used to measure the withdrawals or consumptive use of the project or the rate of stream flow. If the Commission determines that additional flow measuring, metering or monitoring devices are required, these shall be provided at the expense of the project sponsor, installed in accordance with a schedule set by the Commission, be accurate to within 5 percent, and shall be subject to inspection by the Commission at any time.

(a)Project sponsors of projects that are approved under this part shall:

(1) Measure and record on a daily basis, or such other frequency as may be approved by the Commission, the quantity of all withdrawals, using meters or other methods approved by the Commission.

(2) Certify, at the time of installation and no less frequently than once every 5 years, the accuracy of all measuring devices and methods to within 5 percent of actual flow, unless specified otherwise by the Commission.

(3) Maintain metering or other approved methods so as to provide a continuous, accurate record of the withdrawal or consumptive use.

(4) Measure groundwater levels in all approved production wells, as specified by the Commission.

(5) Measure groundwater levels at additional monitoring locations, as specified by the Commission.

(6) Measure water levels in surface storage facilities, as specified by the Commission.

(7) Measure stream flows, passby flows or conservation releases, as specified by the Commission, using methods and at frequencies approved by the Commission.

(b)Reporting.

(1)Project sponsors whose projects are approved under this section shall report to the Commission on a quarterly basis on forms and in a manner prescribed by the Commission all information recorded under paragraph (a) of this section, unless otherwise specified by the Commission.

(2)Project sponsors whose projects are approved under this section shall report to the Commission:

(i) Violations of withdrawal limits and any conditions of approvals, within 5 days of such violation.

(ii) Loss of measuring or recording capabilities required under paragraph (a)(1) of this section, within 5 days after any such loss.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


Statutes at Large
Public Laws

91-575

Title 18 published on 2015-08-22

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 18 CFR Part 806 after this date.

  • 2016-09-21; vol. 81 # 183 - Wednesday, September 21, 2016
    1. 81 FR 64812 - Review and Approval of Projects
      GPO FDSys XML | Text
      SUSQUEHANNA RIVER BASIN COMMISSION
      Notice of proposed rulemaking; notice of public hearings.
      In addition, the Commission will be holding two informational webinars explaining the proposed rulemaking on October 11, 2016, and October 17, 2016. Instructions for registration for the webinars will be posted on the Commission's Web site. Comments on the proposed rulemaking may be submitted to the Commission on or before January 30, 2017. The Commission has scheduled four public hearings on the proposed rulemaking: 1. November 3, 2016, 2 p.m. to 5 p.m. or at the conclusion of public testimony, whichever is sooner; Harrisburg, PA. 2. November 9, 2016, 7 p.m. to 9 p.m. or at the conclusion of public testimony, whichever is sooner; Binghamton, NY. 3. November 10, 2016, 7 p.m. to 9 p.m. or at the conclusion of public testimony, whichever is sooner; Williamsport, PA. 4. December 8, 2016, 1 p.m. to 3 p.m. or at the conclusion of public testimony, whichever is sooner; Annapolis, MD. The locations of the public hearings are listed in the ADDRESSES section of this document.
      18 CFR Parts 806 and 808
The section you are viewing is cited by the following CFR sections.

Title 18 published on 2015-08-22.

The following are only the Rules published in the Federal Register after the published date of Title 18.

For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.

  • 2015-12-11; vol. 80 # 238 - Friday, December 11, 2015
    1. 80 FR 76855 - Review and Approval of Projects
      GPO FDSys: XML | Text
      SUSQUEHANNA RIVER BASIN COMMISSION
      Final rule.
      Effective December 11, 2015.
      18 CFR Part 806