19 CFR 151.8 - Examination after assembly.

§ 151.8 Examination after assembly.
(a) Application by importer. Upon application by the importer, machinery, altars, shrines, and other articles which must be set up or assembled prior to examination may be examined at the mill, factory, or other suitable place after being assembled.
(b) Conditions applicable. The importer shall comply with the conditions set forth in § 151.7 (b) through (d). The port director may also require that a deposit be made of the estimated additional expense. The packages need not be corded and sealed in accordance with § 151.7(a), but the port director may make such preliminary examination as he deems necessary to identify the merchandise with the invoice.
(c) Removal of merchandise and notification of assembly. After the bond required by § 151.7(d) has been filed and any necessary preliminary examination has been made, the port director may permit the merchandise to be removed to the place at which it is to be assembled for examination. Within 90 days after such removal, unless an extension has been applied for and granted by the port director, the importershall notify the port director that the merchandise has been assembled and is ready for examination, whereupon final examination shall be made.
Beta! The text on the eCFR tab represents the unofficial eCFR text at ecfr.gov.
§ 151.8 Examination after assembly.

(a) Application by importer. Upon application by the importer, machinery, altars, shrines, and other articles which must be set up or assembled prior to examination may be examined at the mill, factory, or other suitable place after being assembled.

(b) Conditions applicable. The importer shall comply with the conditions set forth in § 151.7 (b) through (d). The port director may also require that a deposit be made of the estimated additional expense. The packages need not be corded and sealed in accordance with § 151.7(a), but the port director may make such preliminary examination as he deems necessary to identify the merchandise with the invoice.

(c) Removal of merchandise and notification of assembly. After the bond required by § 151.7(d) has been filed and any necessary preliminary examination has been made, the port director may permit the merchandise to be removed to the place at which it is to be assembled for examination. Within 90 days after such removal, unless an extension has been applied for and granted by the port director, the importer shall notify the port director that the merchandise has been assembled and is ready for examination, whereupon final examination shall be made.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 19 published on 2015-04-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 19 CFR Part 151 after this date.

  • 2015-10-26; vol. 80 # 206 - Monday, October 26, 2015
    1. 80 FR 65134 - Automated Commercial Environment (ACE) Filings for Electronic Entry/Entry Summary (Cargo Release and Related Entry); Correction
      GPO FDSys XML | Text
      DEPARTMENT OF THE TREASURY, DEPARTMENT OF HOMELAND SECURITY, U.S. Customs and Border Protection
      Interim final rule; correction.
      Effective November 1, 2015. The effective date for the interim final rule, published October 13, 2015 (80 FR 61278), remains November 1, 2015. Written comments must be submitted on or before November 12, 2015.
      19 CFR Parts 4, 7, 10, 12, 18, 19, 24, 54, 102, 113, 123, 125, 128, 132, 134, 141, 142, 143, 144, 145, 146, 148, 151, 152, 158, 163, 174, 181, and 191